Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2025 at 7:00 PM
Updated January 29, 2025
This is a service / maintenance or supply contract in Bolivia, North Carolina. Contact the soliciting agency for additional information.
Brunswick County is soliciting sealed proposals for dewatering, removal, and disposal of sludge at Brunswick County's Northwest Water Treatment Plant ("NWTP"). The NWTP is a 24mgd water treatment facility. It was constructed in 1984 and treats water from the Cape Fear River via the Kings Bluff Pump Station in Bladen County. Currently, the average raw water flow for 2024 is 14.11 million gallons a day. The NWTP utilizes chlorine dioxide, polyaluminumchloride, polymer, and sodium hydroxide as its primary chemicals in the treatment of drinking water. Sodium fluorosilicate, orthophosphate, chlorine, and ammonia are also used to finish the water before being pumped to the distribution system. River sediment is removed from the treatment process via two routes, one being clarifier sludge blowdowns and the other filter backwashes. Each process has its own unique percent solids and can vary widely. Solids from these processes travel to a two-million gallon settling lagoon. The lagoon is equipped with aluminum handrails, a 20/1 sloped bottom, floor pressure relief valves, a supernatant collector weir, and two 1,200gpm Wemco hydrostal pumps. These two pumps are capable of pumping most of the sludge from the lagoon and transferring it to the 80' circular sludge thickening unit. In the thickening unit, sludge can be stored and thickened until ready to be removed. One 400gpm Wemco hyrdostal pump is currently available along with another 4" attachment point for another pump (contractor supplied). The initial term of the contract, if awarded, shall be three (3) years. The initial term may be followed by three (3) successive options to renew for one (1) year each. Each renewal option is to be exercised automatically unless either party gives notice of its intent not to renew at least ninety (90) days prior to the end of the then-current term.
Post-Bid
Water / Sewer
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
February 27, 2025
Multiple Locations, Bolivia, NC
Related To This Project
Bolivia, NC
Bid Date: Feb 14 2025
Bolivia, NC
Bid Date: Mar 10 2025
Bolivia, NC
Bid Date: Apr 29 2021
Bolivia, NC
Bid Date: Mar 03 2025
Bolivia, NC
Bid Date: Mar 20 2025
Bolivia, NC
Bid Date: Apr 03 2025
Bolivia, NC
Bid Date: Mar 28 2025
Bolivia, NC
Bid Date: Dec 19 2024
Bolivia, NC
Bid Date: Dec 03 2024
Bolivia, NC
Bid Date: Dec 12 2024
Bolivia, NC
Bid Date: Nov 21 2024
Bolivia, NC
Bid Date: Nov 21 2024
Bolivia, NC
Bid Date: Nov 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
