EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a civil project in Asheville, North Carolina. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

Contract Id: C205025 WBS Element No.: DF18313.2011206.PR, DF18313.2011389.PR, DF18313.2011383.PR, DF18313.2011274.PR, and DF18313.2011190.PR Route No. SR 2782, SR 2783, SR 2810, and SR 2832 Miles: N/A Design-build as Specified in the Scope of Work Contained in the Request for Proposals The scope of work for this project includes design, construction and management of the replacement of five structures. Construction shall include, but not be limited to, all necessary clearing, grading, roadway, drainage, structures, utility coordination and relocation, and erosion and sediment control work items for the bridge replacement. Construction shall comply with Standard Specifications and any special provisions. 5% Bid Bond or Bid Deposit Required All firms shall be prequalified by the Department for the work they are to perform. Joint Ventures, LLCs or any legal structure that are different than the existing prequalification status must be prequalified prior to the Price Proposal submittal deadline. Subcontractors need only be prequalified prior to performing the work. Design firms shall be prequalified prior to the Price Proposal submittal deadline. If the work is to be performed by an office other than the one that is prequalified, that office shall be prequalified prior to any design submittals The date of availability for this contract is March 3, 2025, except that the Design-Build Team shall only begin ground disturbing activities as allowed by this Request for Proposals (RFP). The Final Completion Date shall not be later than October 1, 2026. For questions regarding the form or reporting, please contact the State Value Management Engineer at 919-707-4810. NCDOT - RFP D/B - Hurricane Helene Emergency Express Design-Build Division 13 Group 9 Bridge Replacements Submit the Project Construction Reuse and Recycling Reporting Form by August 1 st annually to valuemanagementunit@ncdot.gov. For questions regarding the form or reporting, please contact the State Value Management Engineer at 919-707-4810. Question Deadline 12/30/2024 Questions to ADU online

Award

Bridges / Tunnels

$6,389,388.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Project Identification
Division 08 - Openings

Division 08 - Openings

Hardware
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
53
Bidding Soon
652
All Active Projects
320
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2025

March 3, 2025

img_map_placeholder

Multiple Locations, Asheville, NC


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Hurricane Helene Emergency Express Design-Build Division 13 Group 9 Bridge Replacements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.