BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2025 at 7:00 PM

Updated February 13, 2025

Renovation of a municipal facility in Lake Village, Arkansas. Completed plans call for the renovation of a municipal facility.

Bid Security in the amount of 5% percent of the Base Proposal must accompany each proposal as described in the "Instructions to Bidders." The County reserves the right to reject any or all bids, to waive irregularities and/or information in any bid, and to make an award in any manner, consistent with law, deemed in the best interest of the County. Bids must be sealed and clearly marked. The construction must be completed within 120 calendar days from the issuance of the notice to proceed. The scope of this project includes the cleaning of all masonry surfaces on the north elevation of the building, the 100% repointing of indicated areas of the building and 25% of the remainder of north elevation, installation of sealants, application of masonry waterproofing on the roof side of the lower parapets, replacement of damaged brick and installation of collector heads and downspouts as shown. Refer to the drawings and this project manual for a complete description of the work. The Work consists of restoration/rehabilitation work at a historic building listed on the National Register of Historic Places as shown and described in the drawings and specifications.

Award

Municipal

$77,777.00

Public - County

Renovation

5

9

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
24
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2025

February 20, 2025

Project location map

108 Main Street, Lake Village, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.