Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 22, 2025 at 7:00 PM
Updated November 23, 2025
Site work and paving for a road / highway in Luverne, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
https://cityofluverne.legistar.com/View.ashxM=A&ID=1328397&GUID=E45F6C92-B719-4666-8B5B-80B11541FCC5 PROPOSED RESOLUTION AUTHORIZING EXECUTION OF MNDOT AGREEMENT NO. 1060777 WITH THE STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION FOR TRUNK HIGHWAY NO. 75 DETOUR 21-25 The Highway 75 Detour Agreement (MnDOT Contract No. 1060777) is a cooperative agreement between the Minnesota Department of Transportation (MnDOT) and the City of Luverne. It outlines the terms for temporarily rerouting traffic from Trunk Highway 75 onto East Hatting Street and South Freeman Avenue during phase 3 of the Highway 75 Project construction project. MnDOT will handle all detour signage, maintenance, and traffic control, and will reimburse the City $725.21 for road life consumed, with a maximum obligation of $10,000 should the detour be in place longer than the 30 days anticipated. The agreement also releases MnDOT from restoring the detour route post-construction and includes provisions for audits, data practices, liability, and termination. City Administrator Recommendation: City Council Adopt Proposed Resolution 21-25. K.3. PROPOSED RESOLUTION AUTHORIZING EXECUTION OF MNDOT AGREEMENT NO. 1059929 WITH THE STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION FOR TRUNK HIGHWAY NO. 75 PROJECT PAYMENT 22-25 This agreement is a cooperative construction agreement between the Minnesota Department of Transportation, the City of Luverne, and Rock County for improvements along Trunk Highway 75 from West Maple Street to West Veterans Drive. The project includes grading, surfacing, ADA improvements, lighting, signal systems, watermain, sanitary sewer, and pedestrian crosswalk flasher systems. The City of Luverne will contribute an estimated $1,691,111.14 toward ADA, utility, lighting, and aesthetic improvements, while Rock County will contribute $257,939.99 for signal system components. The agreement outlines responsibilities for construction, maintenance, and cost-sharing, and authorizes the City and County to execute related documents and manage their respective portions of the project. Execution of this agreement is required for the project to proceed and for the City and County to receive federal and state funding support. City Administrator Recommendation: City Council Approve Resolution 22-25 ---------------------------------------------------------------------------------------------- **ac**flex27**: Us75, From N Limits of Luverne to Cr 9 South of Trosky, Mill & Overlay and Replace Br 8358, 8360 and 8361 (Ac Project, Payback in 2029) Work type : Bit. Cold Inplace Recycling Mile : 15.1 Route : US 75 As of November 22 , 2025, the project is in Conceptual status. Anticipated letting Year is 2028. MNDOT- Bit. Cold Inplace Recycling - US 75 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$5,500,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2028
US-75, Luverne, MN
Related To This Project
Luverne, MN
Bid Date: Mar 03 2025
Luverne, MN
Bid Date: Apr 02 2025
Luverne, MN
Bid Date: Apr 07 2025
Luverne, MN
Bid Date: Apr 07 2025
Luverne, MN
Bid Date: Apr 21 2025
Luverne, MN
Bid Date: May 05 2025
Luverne, MN
Bid Date: May 05 2025
Luverne, MN
Bid Date: May 05 2025
Luverne, MN
Bid Date: Jan 09 2025
Luverne, MN
Bid Date: Dec 17 2024
Luverne, MN
Bid Date: Sep 24 2025
Luverne, MN
Bid Date: Jul 10 2024
Luverne, MN
Bid Date: May 09 2024
Luverne, MN
Bid Date: May 06 2024
Luverne, MN
Bid Date: Jun 15 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
