Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2025 at 8:00 PM
Updated March 12, 2025
Site work for a road / highway in Dalton, Georgia. Completed plans call for site work for a road / highway.
Work to be Done: The work to be done (hereinafter referred to as "Work") consists of furnishing labor and equipment for the following project (Hereinafter referred to as "Project"): The work consists of, but is not limited to, a contract that will be signed on or about, Monday, February 24, 2025, after the bids have been reviewed and evaluated. Official contract start date will be Monday, March 3, 2025 and will continue through December 31, 2025. Work will include forty (40) hours a week labor, excluding holidays and inclement weather. Contractor will be responsible to have equipment and tools required for the construction of 7,200/12,470 and 14,400/24,940 VAC 3-phase overhead and underground distribution lines for Dalton Utilities. The contractor will be required to install and remove poles, related capacitor banks, transformers, switches and underground risers and to pull underground wire, re-conductor lines, build new lines and perform other distribution line work related to the improvement of Dalton Utilities' electrical distribution system. Dalton Utilities will provide all material. The contractor must be able to supply needed crews to meet the work requirements of Dalton Utilities. Dalton Utilities reserves the right to adjust the scope and quantities of the work during the contract period as necessary. The bidder must declare that he understands that the scope of work shown in this proposal is subject to adjustment by either increase or decrease by Dalton Utilities. Should the quantities of any of the items of the work be increased, the bidder agrees to do the additional work at the unit prices stated herein. Should the quantities be decreased, he also understands that payment will be made on actual quantities at the unit price bid. Additional Work: Additional work may be awarded in whole or in part in any combination so deemed by Dalton Utilities at the unit prices specified. Bidder Pre-qualification: Pre-qualification of bidders for this project is required. Bidders must submit a pre-qualification package containing requested information to the office of Dalton Utilities by 5:00 P.M., local time, Tuesday, January 21, 2025. All applicants submitting pre-qualification documentation will be notified of their status via phone call to the contact person listed on the package by 5:00 P.M. on Friday, January 24, 2025. Only bids submitted by properly pre-qualified bidders will be opened. Time Allotted: This project is to be completed on or before December 31, 2025. Bids: Bids shall contain complete and detailed prices for labor and equipment. Contractor's License: All bidders must possess any and all licenses and permits as may be required by applicable federal, state and/or local law/ordinances. The Georgia Utility Contractor License Number shall be written on the face of the bid. Performance and Payment Bond: A $250,000.00 Performance Bond and $250,000.00 Payment Bond will be required of the successful bidder. Withdrawal of Bids: Except as provided in O.C.G.A. Section 36-91-43, no submitted bid may be withdrawn for a period of sixty (60) days after the scheduled closing time for the receipt of bids. Acceptance or Rejection of Bids: The right is reserved to accept or reject any and all bids and to waive technicalities and informalities. Statutory Requirements: Not with standing any provision of this advertisement, all proposals must also comply with the minimum applicable requirements of Chapter 91 of Title 36 of the Official Code of Georgia Annotated. E-Verify Requirements: All contractors and subcontractors performing work for Dalton Utilities must participate in the E-Verify Program pursuant to the Georgia Security and Immigration Compliance Act (SB 529). If any Bidder has any question as to the true meaning of the scope of any part of the Work, it shall submit to the Owner a written request for an interpretation thereof. The entity submitting the request will be responsible for its prompt delivery in ample time for an interpretation to be issued before the bid opening date. Questions must be received by 5:00 P.M. on Tuesday, February 4, 2025.
Post-Bid
Roads / Highways
$300,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2025
March 3, 2025
Multiple Locations, Dalton, GA
Related To This Project
Dalton, GA
Bid Date: Feb 11 2025
Dalton, GA
Bid Date: Feb 06 2025
Dalton, GA
Bid Date: Jan 15 2025
Dalton, GA
Bid Date: Feb 18 2025
Dalton, GA
Bid Date: Feb 19 2025
Dalton, GA
Bid Date: Feb 26 2025
Dalton, GA
Bid Date: Feb 07 2025
Dalton, GA
Bid Date: Feb 13 2025
Dalton, GA
Bid Date: Feb 06 2025
Dalton, GA
Bid Date: Oct 03 2025
Dalton, GA
Bid Date: Nov 26 2024
Dalton, GA
Bid Date: Nov 26 2024
Dalton, GA
Bid Date: Dec 23 2024
Dalton, GA
Bid Date: Dec 20 2024
Dalton, GA
Bid Date: Dec 03 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
