Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Evans, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Reference Number 0000371349 Job Location: 23rd Ave; Prairie View Rd; 17th Ave Question Deadline 01/06/2025 at 9:00 AM MT Questions are submitted online No Work for the 2025 Major Roads Project consists of (3) three separate projects. 1. The first project will be a Mill and Overlay of 23rd Avenue from 32nd Street to 37th Street. 2. The second Project will be a full Asphalt Reconstruction of Prairie View Drive from 35th Avenue to 23rd Avenue 3. The third project will be a Mill and Overlay of 17th Avenue from 32nd Street to 37th Street. Each roadway will also undergo concrete replacement of damaged concrete curb & gutter, sidewalks, street pans, or upgrading of ADA ramps for safety / compliance prior to asphalt placement. Project # 1 will consist of a 3" inch Mill and Overlay of 23rd Avenue from 32nd Street to 37th Street. The roadway is believed to be (12") Twelve-inch thickness of asphalt mat over (8") Eight-inch Class 6 Base Material. In-situ earthen material is sandy clay loam. Potholing of this roadway is not expected, but a line item is added to the bid schedule if it becomes necessary. Work for Project # 1 (23rd Avenue) of the 2025 Major Roads Project consists of roto-milling the entire surface of existing asphalt pavement to a 3" three inch depth, installing an emulsified tack layer, placement of a fiberglass underlayment (Tru-pave or similar approved product), placement of a (3") three inch top lift hot mix asphalt Grading S, SP 64-22, adjusting of existing water valves, sanitary sewer manholes, and storm drain manholes which are to be 1/4 inch below the asphalt surface. Concrete collars will be installed around existing utility box structures, survey monuments, and manholes. Installing all thermoplastic symbols, crosswalks, and stop bars, and installing all striping with epoxy paint back to original striping design. Survey and installation of new Section Corners, and Quarter Corners to re-establish our geodetic survey points are expected for this project. It is anticipated that all concrete reconstruction of identified areas will commence in early spring (March 15th) This will require concrete blankets to cure the replacement areas for at least (7) seven days. The City of Evans recognizes that the project is located on an arterial roadway with accessibility concerns for the commercial properties during construction. This site is also near a school, so summer construction is necessary. We will need to keep access open throughout the project, but do not want the increased traffic a school will surely bring when it is in session. The City of Evans will also be installing a new traffic signal located at 23rd Avenue and 34th Street and are planning for roadway boring and installation to be completed prior to paving. Project # 2 will consist of full asphalt reconstruction of Prairie View Drive from 35th Avenue to 23rd Avenue. The roadway is believed to be (5") Five-inch thickness of asphalt mat over compacted in-situ earthen material. In-situ material is clay to pockets of sandy clay loam. Work for Project # 2 (Prairie View Drive) of the 2025 Major Roads Project consists of roto-milling the entire surface of existing asphalt pavement estimated to be (5") Five inches in depth, removal of (9 ") nine inches of in-situ sub-grade material, cement treating the in-situ sub-grade material to a depth of (12") Twelve inches scarification, compaction and re-grading of cement treated sub-grade material, installing an (8") eight inch Class 6 base course layer (crushed concrete is not a suitable replacement product and will be strictly refused), compaction and grading of base course layer, soil sterilization of entire surface of the base course layer, placement of a (3") three inch bottom lift hot mix asphalt Grading S, SP 64-22, installing an emulsified tack layer, placement of a (3") three inch top lift hot mix asphalt Grading S, SP 64-22, adjusting of existing water valves, sanitary sewer manholes, storm drain manholes, and survey monuments, which are to be 1/4 inch below the asphalt surface. Concrete collars will be installed around existing utility box structures and manholes. Installing all thermoplastic symbols, crosswalks, and stop bars, and installing all striping with epoxy paint back to original striping design. Survey and installation of new Section Corners, and Quarter Corners to re-establish our geodetic survey points are expected for this project. The City of Evans recognizes that the project is located on an arterial roadway with accessibility concerns for the residents during construction. There is one subdivision that will require access across the project site located at Harbor Lane, otherwise we are anticipating a hard road closure for all other access points into the project area. We will need to keep access open to this subdivision throughout the project. Project # 3 will consist of a 3" inch Mill and Overlay of 17th Avenue from 32nd Street to 37th Street. The roadway is believed to be (6") Six-inch thickness of asphalt mat over (8") Eight-inch Class 6 Base Material. In-situ earthen material is sand. Potholing of this roadway is not expected, but a line item is added to the bid schedule if it becomes necessary. Work for Project # 3 (17th Avenue) of the 2025 Major Roads Project consists of roto-milling the entire surface of existing asphalt pavement to a 3" three inch depth, installing an emulsified tack layer, placement of a fiberglass underlayment (Tru-pave or similar approved product), placement of a (3") three inch top lift hot mix asphalt Grading S, SP 64-22, adjusting of existing water valves, sanitary sewer manholes, and storm drain manholes which are to be 1/4 " inch below the asphalt surface. Concrete collars will be installed around existing utility box structures, survey monuments, and manholes. Installing all thermoplastic symbols, crosswalks, and stop bars, and installing all striping with epoxy paint back to original striping design. Survey and installation of new Section Corners, and Quarter Corners to re-establish our geodetic survey points are expected for this project. It is anticipated that all concrete reconstruction of identified areas will commence in early spring (March 15th) This will require concrete blankets to cure the replacement areas for at least (7) seven days. The City of Evans recognizes that the project is located on an arterial roadway with accessibility concerns for the residential properties during construction. This site is also near a school, so summer construction is necessary. We will need to keep access open throughout the project, but do not want the increased traffic a school will surely bring when it is in session. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %
GC Bidding
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 10, 2025
February 4, 2025
Multiple Locations, Evans, CO
Related To This Project
Evans, CO
Bid Date: Jan 30 2025
Evans, CO
Bid Date: Jan 03 2025
Evans, CO
--
Evans, CO
Bid Date: Nov 21 2024
Evans, CO
Bid Date: Oct 03 2024
Evans, CO
Bid Date: Sep 19 2024
Evans, CO
Bid Date: Sep 26 2024
Evans, CO
Bid Date: Aug 22 2024
Evans, CO
Bid Date: Aug 29 2024
Evans, CO
Bid Date: May 31 2024
Evans, CO
Bid Date: May 23 2024
Evans, CO
Bid Date: May 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.