BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 5, 2025 at 7:00 PM

Updated February 6, 2025

Site work and paving for a road / highway in Montevideo, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of January 30, 2025. Project not awarded yet; anticipated award date is next week. Bituminous Surfacing, Aggregate Base, & Shoulder Base Aggregate; Mill, Overlay & Aggregate Shouldering; Mill, Overlay & Aggregate Shouldering; Mill, Overlay & Aggregate Shouldering; Mill, Overlay & Aggregate Shouldering Minimum wage rates to be paid by the contractor(s) have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581. Those, which apply to this project, are set forth in the proposal for this project: SAP 012-604-021: Bituminous Surfacing, Aggregate Base & Shoulder Base Aggregate SAP 012-604-024: Mill, Overlay & Aggregate Shouldering SAP 012-605-021: Mill, Overlay & Aggregate Shouldering SAP 012-613-031: Mill, Overlay & Aggregate Shouldering SAP 012-618-003: Mill, Overlay & Aggregate Shouldering Approximate major items of work include: 20,619 Tons of Shoulder Base Aggregate Class 5 Mod, 22,978 Tons of Aggregate Base Class 5 Mod, 141,037 Sq. Yds. of Mill Bituminous Surface (2), 111,660 Sq Yds of Mill Bituminous Surface (1.75), 64,247 Tons of Plant Mixed Bituminous Pavement (types and mixtures vary), 253,699 Lin. Ft. of Pavement Markings, Construction Surveying, Erosion Control, Subgrade Preparation and Traffic Control. Each bid must be accompanied by a certified check or bidders bond made payable to Chippewa County in a sum not less than 5% of the bid. See Proposal for acceptable forms of a bid bond. The County reserves the right to reject any and all bids, to wave any informalities therein and to accept the bid deemed most advantageous to the County. Award Date: 2/4/2025 Contract Start Date: 5/15/2025 Construction Start Date: 5/15/2025 Construction End Date: 9/12/2025 Work Type: Aggregate, Bituminous, Mill and Overlay, Traffic Control, Traffic Marking/Striping Project Type: Road and Street MN DOT: Bituminous Surfacing, Aggregate Base & Shoulder Base Aggregate

Award

Roads / Highways

$4,931,067.00

Public - County

Paving, Site Work

21

5

8

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
18
Bidding Soon
280
All Active Projects
118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

May 15, 2025

img_map_placeholder

Multiple Locations, Montevideo, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.