EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 31, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Shawnee, Oklahoma. Completed plans call for site work for a water / sewer project.

N. Midland Addition Water Line Replacement - Replacement of approximately 1,100 feet of 2-inch and 4-inch water line to 8" HDPE and related appurtenances in the same corridors that runs along Scott Street and N. Minnesota Ave. and related appurtenances in the same corridors. a Cashier's Check or a Certified Check on a Solvent Bank in Oklahoma or a Proposal Bond in the Amount of Five percent (5%) of the Bid Shall Accompany the Bid of Each Proposer. The Check or Bond Shall Be Made Payable To the Owner. All Checks or Bonds Will Be Returned to Unsuccessful Proposers. This Check or Bond Shall Be as A guarantee of Contractor's Ability to Perform the Contract Bid Upon, and That He Will Enter Into a Written Contract with the Owner to Perform Said Work and/or Furnish Said Materials in Accordance With Said Specifications And furnish the Required Bonds Within Ten (10) Business Days After the Acceptance of His Bid. No Proposer May withdraw His Bid for a Period of Sixty (60) Days After the Closing Date for the Receipt of Bids .bid, Performance, Maintenance and Statutory Payment Bonds in the Amount of 100% of the Contract Price Each with a Corporate Surety Licensed in Oklahoma and Approved by the Owner Will Be Required for the Faithful performance of the Contractor for Projects Over Fifty Thousand Dollars ($50,000.00), and the Bidder Shall State In the Bid the Name and Address of the Surety or Sureties Who Will Sign This Bond in Case the Contract is Awarded to Him. Copies of Acceptable Bond Forms Are Included in This Packet. Maintenance Bond Guaranteeing the Repair of All Damage Due to Improper Materials or Workmanship for A period of One (1) Year After the Acceptance of the Work by the Owner Will Be Required. questions Concerning This Project Should Be Addressed to the Engineering Department at (405) 878- 1506. Question Deadline 01/10/2025 at 5:00 PM CT the Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities in Any Bid and Award a Contract To the Proposer Who, in the Opinion of the Owner, Offers a Bid Which Appears to Be in the Best Interest of The owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completion-150days

Bid Results

Water / Sewer

$387,242.00

Public - City

Site Work

16

21

8

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Construction Progress Schedule, Photographic Documentation, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Backhoes
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
68
Bidding Soon
788
All Active Projects
358
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

March 17, 2025

img_map_placeholder

W Midland St, Shawnee, OK


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

N. Midland Addition WaterLine Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.