BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 6, 2025

Demolition, site work, paving and new construction of a civil project in Cleveland, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

For the Flood Reduction at Riverview Road in Brecksville Project. In General, the Work Shall Consist of Furnishing All Labor, Materials, Equipment, and Incidentals for Construction of the Following Work: Approximately 1,800 Lf of Roadway Reconstruction, Elevating Riverview Road, Wiese Road, and Greenhaven Parkway to Mitigate Flooding, Replacement of Two Existing Bridges Across Riverview Road, Replacement of Approximately 1,000 Lf of Water Main, and Installation of New Storm Sewers and Catchment Structures. The Neorsd Will Not Be Responsible or Liable for Project Addenda That Are Not Received by the Bidder Due to Incorrect or Out-of-date Contact Information. The Neorsd Reserves the Right to Reject Any and All Bids, to Waive Any Informalities or Irregularities in the Bids Received. Bidders Shall Review the Instructions to Bids and All Other Contract Documents Prior to Submitting a Bid for This Project. The Contract Will Be Subject to the Neorsd Policies and Goals Regarding the Use of Minority, Women, and Small Business Enterprises (Mbe/wbe/sbe). This Policy is Contained in the Contract Specifications. The Mbe/wbe/sbe Goal for This Contract is 10% Mbe/wbe and 5% Sbe. Estimate for the Flood Reduction at Riverview Road in Brecksville Project is $4,833,000.00. For This Project, Neorsd Will Not Award a Contract for Any Bid in Excess of Twenty Percent (20%) Above the Estimate of Probable Construction Cost. All Questions Regarding the Contract Documents Shall Be Directed to the Project Manager for the Neorsd, Derek Vogel, P.e. At Vogeld@neorsd.org. Deadline for Questions: Monday, January 27, 2025 at 4:30 pm

Bid Results

Water / Sewer

$4,969,143.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

131

23

6

10

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
125
Bidding Soon
2,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

April 7, 2025

Project location map

Multiple Locations, Cleveland, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.