Published January 31, 2025 at 7:00 PM

Updated February 1, 2025

Site work and paving for a mixed-use development in Columbus Junction, Iowa. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

Work generally consists of regrading the existing sod football field and soccer including, but not limited to: - Grading, Excavation, Subgrade Preparation and Modified Subbase - Removal and Replacement of Storm Sewer - Hot Mix Asphalt Pavement - Pavement Removals - Temporary Traffic Control - Erosion Control Items - Installation of Goal Posts, and Long Jumps See Bid Form for exact quantities Site Directions: Approximately 700 feet Northwest of the Intersection of Colton Street and Flat Iron Drive, Columbus Junction, Iowa Bid security shall be provided in the form of a cashier's check or certified check drawn on a state chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid. The bid security shall be included in a separate sealed envelope, plainly marked "bid bond". The bid security shall be forfeited as liquidated damages if the successful bidder fails proper execution of the contract documents The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. The contractor may begin work once contracts have been fully executed All work within the football field (zone 1) shall be completed by April 25, 2025 Work within the D-Zones and outside the football field and track (zone 2), shall be completed by May 30, 2025 Polyurethane surfacing shall be completed by June 27, 2025 The right to accept or reject any or all bids and to waive informalities is reserved.

Bid Results

Playgrounds / Parks / Athletic Fields

$352,333.00

Public - City

Paving, Site Work

27

15

8

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
74
Bidding Soon
931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 24, 2025

Project location map

Colton St & Flat Iron Dr, Columbus Junction, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.