Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2025 at 8:00 PM
Updated October 23, 2025
Site work for a water / sewer project in Warrenton, Virginia. Conceptual plans call for site work for a water / sewer project.
The Town's water distribution system has 18 miles of cast iron (CI) pipe ranging in age from 40-80+ years. Although CI is serviceable beyond 80 years, staff will evaluate and schedule for replacement of problematic sections of the system that are experiencing increasing breaks and maintenance requirements. The Town plans to replace the water main along Lee Highway from Winchester Street to Blackwell. The design process will begin in FY 2027 and construction phase is planned for FY 2029. The water main needs to be replaced prior to the construction of the two roundabouts at Winchester Street and Blackwell Road. The project is included in the City's 2026 - 2031 Capital Improvement Program (CIP). As of October 22, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$2,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2029
E Lee Hwy, Warrenton, VA
Related To This Project
Warrenton, VA
Bid Date: Feb 26 2025
Warrenton, VA
Bid Date: Apr 15 2025
Warrenton, VA
Bid Date: Feb 26 2025
Warrenton, VA
Bid Date: Feb 04 2025
Warrenton, VA
Bid Date: Mar 14 2025
Warrenton, VA
Bid Date: Mar 18 2025
Warrenton, VA
--
Warrenton, VA
--
Warrenton, VA
--
Warrenton, VA
--
Warrenton, VA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
