EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 21, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Lake Geneva, Wisconsin. Completed plans call for site work for a bridge / tunnel.

Question Deadline 01/09/2025 Questions received less than 7 days prior to the date for opening of bids may not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. White River Culvert Replacement Project Bid Form* Item No. Item of Work Est. Quantity Unit Bid Price 1 Mobilization 1 Ls 2 Coffer Dam: Install Large Rock Bags, Divert Flows and Dewater (X 2) 1 Ls 3 Install Erosion Control Barriers. 1 Ls 4 Remove Existing Cmps and Haul Offsite. 4 Ea 5 Install 60" Rcp Class V Culverts (Including Stone Base & Backfill) 240 Lf 6 Place and Compact 1-1/4" Dense Graded Crushed Stone Base for Roadway. 200 Ton 7 Place Field Stone Headwalls 250 Sf 8 Restore Remaining Areas With Topsoil, Seed and Fabric 600 Sy Total: *All Work Must Be Conducted in Compliance With the Plans, Specifications and All Local, State and Federal Permits. Bids Are Being Solicited From the City of Lake Geneva Utility Commission for The Following: Bids Shall Be Accompanied by a Bid Bond and a Statement of Bidder's Qualifications to the Lake Geneva Utility Commission, Wisconsin. The Successful Bidder Will Be Required to Furnish a Certificate of Insurance, A Performance Bond and a Payment Bond. All Bids Should Be Delivered to the Utility Director's Office, Lake Geneva Utility Commission, P.o. Box 187, 361 W Main Street, Lake Geneva, Wisconsin 53147 and The Name and Address of the Bidder Marked on the Outside of the Envelope. The Bid Envelope Shall Be Clearly Entitled "White River Culvert Replacement Project". Per the Utility, the Successful Bidder is Not Required to Show Proof of Compliance to Wage Rate Schedules, as Per Wisconsin Statue 66.293, Where Applicable. The Lake Geneva Utility Commission Reserves the Right to: A. Accept or Reject Any or All Bids With Respect to Irregularities or Technicalities, or To Reject All Bids Outright, and Further, to Award the Contract to the Bidder Who, in Judgment of the Utility, Will Best Serve the Interest of the Lake Geneva Utility Commission. B. Select Portions of, or the Entire Bid, and to Modify the Scope or Limits of The Contract, Eliminate Specific Bid Items, Etc., Based on Budget and Bid Results Considerations. Josh Gajewski Utility Director 262-248-2311 Ext. 403 Email: Jgajewski@lgutilities.org Project Engineer: Mark Ellena, Pe Ellena Engineering Consultants, Llc Mellena@eeceng.com 262-719-6183

Award

Bridges / Tunnels

$144,500.00

Public - City

Site Work

5

7

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
166
Bidding Soon
2,775
All Active Projects
1,196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

February 17, 2025

img_map_placeholder

Multiple Locations, Lake Geneva, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

White River Culvert Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.