BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work and paving for a civil project in Saugus, Massachusetts. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

**As of February 26, 2025, this project has not yet been awarded. A timeline for award has not yet been established. **As of February 21, 2025 , this project has not yet been awarded. The project is expected to be awarded on next week. Ballard St & Central St Water Main Project. removal of existing 12-inch cast iron on Ballard St and replacement of 360 linear feet ductile iron pipe removal of existing 10-inch cast iron water main on Central St. Replacement of 370 linear feet of 12-inch ductile iron pipe. The work at both areas includes bypass piping, new valves, hydrants, hydrant branches, appurtenances, water service replacements with copper tubing, trench paving All services, delivery, and other required support shall be conducted in Saugus and other locations designated by the Department point of contact. Meetings between the Vendor and Town personnel shall be held at the Town of Saugus, Massachusetts, unless otherwise specified. The Town shall pay and the Contractor receive, as full compensation for providing and doing everything necessary to prepare for and perform all the work required by the contract, the price(s) stated in the bid. Invoicing should be done on a monthly basis no more than 12 payments per budget. Extra work should be billed separately. Payment for emergencies, etc., shall be made within thirty days after the conclusion of the work. Invoices, listing the date and place of services, shall be submitted to the Public Works Director and subject to his review and approval. Installation of 6, 8, 10 and 12-inch water main in BALLARD STREET AND CENTRAL STREET including portions of water main abandonment and replacement, replacement of services, hydrants, valves and tie-in to different water main and other appurtenances work. Questions are due: January 22, 2025 at noon. Questions concerning this solicitation must be delivered in writing to both parties below: Nick Bouthilette, P.E. Project Manager Stantec Via email at: nicholas.bouthilette@stantec.com Erica Lotz, P.E. Technical Advisor Stantec Via email at: erica.lotz@stantec.com

Bid Results

Water / Sewer

$855,916.00

Public - City

Paving, Site Work

10

12

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
196
Bidding Soon
3,842
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

April 1, 2025

Project location map

Multiple Locations, Saugus, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.