Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Demolition, site work, paving and new construction of a mixed-use development in Deer Park, Texas. Completed plans call for the demolition of a stadium; for the construction of a stadium; for site work for a stadium; for paving for a stadium; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; museum; museum; museum; and museum.
As of arch 28th, 2025 construction work has commenced. All sub trades have been awarded at this time. ***Please contact Rogers O' Brien Construction directly for access to plans and specifications.*** Construction of a new single-story Jimmy Burke Activity Center and Museum and Visitor Center located on an undeveloped portion of city owned property on W 13th Street. The site is adjacent to the planned location of the new Deer Park Fire Station No. 1, the existing Jimmy Burke Activity Center and the existing Battleground Golf Course. The new building will replace the antiquated Jimmy Burke Activity Center, which will be demolished as part of the project scope. The site scope will consist of 503 proposed parking spaces to serve the new buildings and new sidewalk connections to the baseball and softball complex. A lift station will be needed for the complex and will be designed with the project scope. The building scope will include two buildings, Jimmy Burke Activity Center and the Museum + Visitor Center, with a connecting canopy. The Jimmy Burke Activity Center will include a 25,000 SF dividable multipurpose event space, pre-function corridor space, a fully functional catering kitchen, catering vestibule, large amounts of storage, dressing room, two banks of restrooms, and support spaces. The Museum + Visitor Center building will include a 2,000 SF Museum exhibit space, four offices, conference room, restrooms and support spaces. *This project has been awarded and all trades have been let.
Under Construction
Museum
$600,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2025
March 3, 2025
500 W 13th St, Deer Park, TX
Related To This Project
Deer Park, TX
Bid Date: Feb 20 2025
Deer Park, TX
Bid Date: Mar 06 2025
Deer Park, TX
--
Deer Park, TX
Bid Date: Mar 21 2025
Deer Park, TX
--
Deer Park, TX
--
Deer Park, TX
--
Deer Park, TX
Bid Date: Nov 22 2024
Deer Park, TX
Bid Date: Dec 04 2024
Deer Park, TX
--
Deer Park, TX
Bid Date: Nov 05 2024
Deer Park, TX
Bid Date: Aug 22 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
