BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Peoria, Illinois. Completed plans call for site work for a water / sewer project.

Rehabilitation of the Effluent Screw Pumps Not Less Than the Prevailing Rate of Wages as Found by the Illinois Department of Labor or Determined by a Court on Review Shall Be Paid to All Laborers, Worker and Mechanics Performing Work Under This Contract. Each Proposal on the Work Shall Be Accompanied by a Bidder's Bond, Deposit of Cash or a Certified Check, Payable to the Order of the Greater Peoria Sanitary District, in an Amount Not Less Than Ten Percent (10%) of the Aggregate Amount of the Bid. All Certified Checks Must Be Drawn on Some Responsible Bank and Shall Be Made Payable to the Order of the Greater Peoria Sanitary District. Bidder's Bonds Submitted With Proposals Shall Be Issued by Companies Whose Long-term Issuer Credit Rating as Provided by a.m Best is No Worse Than "a-" (Excellent) or Better and Whose Financial Strength Rating is No Worse Than "a-" (Excellent). If Coverage is Cancelled or the Carrier's Rating Falls Below These Minimum Ratings, the District Shall Be Notified in Writing. Through an Intergovernmental Agreement, the Greater Peoria Sanitary and Sewage Disposal District Has Adopted the Equal Employment Opportunity Goals Established by the City of Peoria. No Bid Will Be Accepted Which Does Not Include an Executed Subcontractor Utilization Statement (if Applicable), an Executed M/wbe Participation Waiver Request (if Applicable), a List Containing the Name of Each M/wbe Company Contacted as Well as the Date and Method of Contact, and a City of Peoria Certificate of Compliance Number or Satisfactory Documentation of the Bidder's Efforts to Obtain Such a Number From the City of Peoria's Equal Employment Opportunity Office. The Contractor shall be responsible for monitoring changes to the prevailing rates of wages as revised by the Department of Labor. The Contractor to whom the work is awarded shall comply with the requirements of Sanitary District Ordinance No. 579 as may be amended from time to time, cited as the Employment of Trained Workers on Construction Contracts. The Contractor shall submit an affidavit stating compliance with this Ordinance at the time of bid. The form of the required affidavit has been included within the appendices of these Specifications. The Contractor shall review the District's safety policy prior to beginning any work and shall sign a statement of understanding before being allowed to begin work at the treatment plant or on the collection system.

GC Bidding

Water / Sewer

$700,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
65
Bidding Soon
619
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.