BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 21, 2025

Demolition, site work, renovation and addition to a medical facility in Gold Beach, Oregon. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the renovation of a medical facility; and for site work for a medical facility.

Curry Health Network is seeking proposals from firms interested in providing General Contracting and Construction services for a two-story expansion project on the Curry General Hospital campus at 94220 4th Street, Gold Beach, OR 97444. Summary Project Description: This Project Includes Phase 1 - construction of a 7,024 sqft, attached two story addition located on the south side of Curry General Hospital located at 94220 4th Street, Gold Beach, OR. The lower level to contain a Materials Management and Supplies area of approximately 1,850 sqft and a Bio-Med shop area of about 1,325 sqft. The first floor to contain a new Infusion Therapy Program of approximately 1,290 sqft, a Chemotherapy drug mixing space and Pharmacy support spaces and other support/ancillary spaces of 1,550 sqft. There are miscellaneous spaces scattered throughout the lower level and level 1, but not listed as well, but in general the lower level is approximately 3,414.7 s.f. and the first level is approxmately 3,609.56 s.f.. In addition, and not required to be a part of the building square footage by the I.B.C. is a fully enclosed penthouse, on the level 1 roof - approximately 900 s.f..The Project will also include Phase 2 - a remodel and expansion of the existing 3rd floor Hospital Pharmacy into the existing vacated Infusion space. Contract Scope: Design, construction, demolition, renovation, hazardous material removal, construction financing, and facility operations during occupancy. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$8,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

208

28

99

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

April 21, 2025

Project location map

94220 4th St, Gold Beach, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.