Published January 28, 2025 at 7:00 PM

Updated July 12, 2025

Renovation of a municipal facility in Rapid City, South Dakota. Completed plans call for the renovation of a municipal facility.

Public Safety Building (PSB) Roof Replacement. No bidder may withdraw a bid for 30 days following the bid opening without a written request explaining the cause of the withdrawal and without written consent of the Owner after reviewing the cause. Liquidated damages shall be in effect for this project. See Bid Form, Agreement for Construction, and the General Conditions for details. Each bid shall be accompanied by a certified check, a cashier's check or draft certified or issued by a state or national bank, in the amount of at least five percent (5%) of the total amount of the bid, payable to Pennington County; or in lieu thereof, bidder may furnish a bid bond in the amount of not less than ten percent (10%) of the amount of the bid, such bond to be issued by a surety authorized to do business in the State of South Dakota and payable to Pennington County as a guarantee that such bidder will enter into a contract for the work described in the bid and as specified. The Pennington County Commission reserves the right to reject any part of, or all bids, and to waive any informalities or irregularities therein. Technical questions shall be directed to CO-OP Architecture, 600 Kansas City St. #1, Rapid City, SD, 57701, 605-716-3652. The anticipated construction schedule is as follows: Commencement of Contract: On or near February 3rd , 2025 Commencement of Construction: On or near May 3rd , 2025 Certificate of Substantial Completion: August 29th , 2025 Final Completion: October 4th , 2025 For each day past the substantial completion date, the delinquent prime contractor Shall pay to the owner as a penalty by reason of failure of the prime contract to Complete the work required of him/her within the agreed upon progress schedule, a Daily sum based upon the following schedule: General contractor: $500 per calendar day from august 29 Th , 2025 thru substantial completion. Bid date notes: Bids shall be submitted to the Pennington County Buildings & Grounds Office in a sealed envelope with the name and address of the bidder clearly identified on the envelope and the words "Bid for PSB Roof Replacement". Faxed bids will not be accepted; nor, will faxed bid adjustments be accepted. One combined bid will be accepted for the complete construction (all materials and labor) as required to provide a complete project.

Bid Results

Municipal

$154,176.00

Public - County

Renovation

8

11

11

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
86
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

May 3, 2025

Project location map

300 Kansas City St, Rapid City, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.