Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 6, 2025 at 7:00 PM
Updated April 17, 2025
Demolition, site work, asbestos abatement and renovation of a mixed-use development in Camillus, New York. Completed plans call for the demolition of a stadium; for the renovation of a stadium; for site work for a stadium; for asbestos abatement for a stadium; educational facility; educational facility; educational facility; and educational facility.
Contractors should refer to the 2008 Wicks Reform and New York State Labor Law Section 220-i for additional bid submission procedures and requirements not otherwise outlined in the contract documents. Each Bidder must deposit with its Bid, security in an amount and form subject to the conditions provided in the Contract Documents. The Owner reserves the right to waive any informality in or to reject any or all Bids. West Genesee High School SED # 42-01-01-06-0-007-017 Old Pressbox Demo SED # 42-01-01-06-7-008-002 Pressbox at HS Lower Stadium SED # 42-01-01-06-7-019-001 Storage Building at HS Lower Stadium SED # 42-01-01-06-2-020-001 RFIs may be emailed to the following: King + King Architects: Erika Civitella ecivitella@kingarch.com Watchdog Building Partners: Lester Roberts lroberts@watchdogbp.com Watchdog Building Partners Faye Lynn flynn@watchdogbp.com The project consists of renovations and site improvements to the West Genesee Central School District main building and parking lot areas. A. General Construction Contract #23-101 1. The General Construction Contractor (GC) shall furnish all material, labor, equipment, subcontractors, supervision, management, and administration required for the total performance of the work of this contract as listed in the following specification sections and shown on the following drawings including, but not limited to: a. All work for project as shown on drawings: i. Code Compliance Drawings prefixed with the letters (G) ii. Hazardous Materials Drawings prefixed with the letters (X) iii. Structural Drawings prefixed with the letters (S) iv. Architectural Drawings prefixed with the letters (A) b. Watchdog Building Partner's Project Manager shall assign MEP sheets, location and drawing notes that specifically pertain to the General Construction Contract. c. Provide the complete work for all sections of Divisions 00, 01, 02, 03, 04, 05,06. 07, 08, 09, 10, 12, 22, and 31 as applicable and 32 as applicable 2. The GC shall provide cleaning equipment and tools necessary to keep the job site clean during construction operations. Cleaning equipment and tools shall include brooms, flat scoop shovels, dust pans, trash carts, trash receptacles, garbage bags, sweeping compound and equipment to move large amounts of debris from the building to the dumpster. 3. Furnish and install all labor, material, supervision, equipment, scaffolding, layout, engineering, deliveries, trucking, hoisting, rigging, shop drawings, submittals, and all other items related and required to complete all General Trades Work in accordance with the contract documents and all applicable codes having jurisdiction. 4. The contractor represents they have expertise in the performance of work for this trade and assures all items to be complete, functional, and installed in accordance with the best practices consistent with premium quality material and workmanship. 5. The GC shall provide a laborer for one hundred (200) hours to work under the direction of the Construction Manager. The GC shall calculate the 200 hours at a rate of $85/hr. and shall include this cost as part of the base bid. Hours shall be tracked by submission of weekly time tickets provided by the GC and signed by the Construction Manager. 6. The GC shall provide temporary protection for doors, hardware, and finishes (i.e., millwork, counters, flooring, etc.) installed under their contract until the time of final cleaning. 7. The GC is responsible for providing temporary protection on any exterior openings (i.e., window, door, etc.). All openings need to be secured at the end of each workday. With the exception of roof openings being performed by the Mechanical Contractor. 8. The General Contractor shall provide all rough carpentry blocking required for the project unless specifically defined in other prime contractor's scope of work. 9. General Contractor shall furnish and install all hardware cores, cylinders and labels for the scope of its contract for all new doors and frames that are in the General Contractor contract. General Contractor will install all electric strikes for the scope of its contract and provide transformers for power actuated hardware. The Electrical Contractor shall provide power and connections for transformers and pipe and wire back to nearest available power panel. 10. The General Contractor is responsible to protect all interior equipment and finishes during roof replacement if the roofing is in their scope. 11. The GC shall prioritize and expedite submittals for materials with typical long lead times such as hollow metal doors and frames installed in masonry walls. 12. The GC shall provide necessary custom fitted closure trim around any windows installed in the contract. 13. The GC shall provide professional cleaning services for final cleaning. 14. The GC shall designate an employee dedicated to secure the building/construction site at the end of each work shift at each location. The designated GC employee shall close and lock all doors, gates and windows.
Award
Educational
$972,000.00
Public - City
Asbestos Abatement, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2025
June 9, 2025
Multiple Locations, Camillus, NY
Related To This Project
Camillus, NY
Bid Date: Jan 29 2025
Camillus, NY
Bid Date: Feb 11 2025
Camillus, NY
Bid Date: Mar 13 2025
Camillus, NY
Bid Date: Feb 20 2025
Camillus, NY
Bid Date: May 23 2025
Camillus, NY
Bid Date: Aug 21 2025
Camillus, NY
Bid Date: Sep 17 2025
Camillus, NY
Bid Date: Sep 17 2025
Camillus, NY
Bid Date: Jan 29 2025
Camillus, NY
Bid Date: Jan 23 2025
Camillus, NY
Bid Date: Sep 24 2024
Camillus, NY
Bid Date: Jul 30 2024
Camillus, NY
Bid Date: Oct 24 2024
Camillus, NY
Bid Date: Jul 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
