Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work and paving for a bridge / tunnel in Upper Arlington, Ohio. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The 2020 Annual Bridge Inspection Report identified Fishinger Road Bridge (No.10) for tunnel lining rehabilitation in 7 to 15 years. The following are excerpts from the report prepared by American Structurepoint, under contract with the City of Upper Arlington: Reference No.: Bridge No. 10 (SFN: 2568640) Recommended Capital Improvement No. 1. General Appraisal: 5A Joint material starting to break at the seams Upstream channel apron has large spalls and is deteriorating Deterioration along the invert for the majority of the length of the culvert The project is included in the City's 2025-2034 Capital Improvement Program (CIP). As of September 23, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$930,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
Fishinger Rd, Upper Arlington, OH
Related To This Project
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
--
Upper Arlington, OH
Bid Date: Feb 06 2025
Upper Arlington, OH
--
Upper Arlington, OH
Bid Date: Jan 15 2025
Upper Arlington, OH
Bid Date: Jan 07 2025
Upper Arlington, OH
Bid Date: Nov 27 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
