Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 23, 2026 at 7:00 PM

Updated November 28, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Newbury, Vermont. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Location: Washington County Railroad, Connecticut River Line - Lyndonville Subdivision, Bridge No. 520 Over Harriman Brook at Mile Post 68.86 in Newbury Type of Construction: Removal and Replacement of Existing Steel Superstructure and Concrete Bridge Seats and Backwalls With Steel Open Deck Superstructure, Precast Concrete Bridge Seats and Backwalls, and Associated Track Work and Channel Armoring. Engineer's Estimate: for This Proposal the Engineer's Estimate is Category D: $1,000,000 - $2,500,000 During the Advertisement Period, All Questions Shall Be Addressed Solely to the Office of Contract Administration via Email: Aot.constructioncontractinginquiry@vermont.gov. All inquiries must be received by 4:30 PM on Wednesday, November 18, 2026. All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the "Contractor's Experience Questionnaire and Financial Statement" and Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form. The Right is Reserved to Reject Any or All Bids, to Waive Any Formality, and Any and All Technicalities in Bids, and to Accept Such Bids as May Be Deemed in the Best Interest of the Awarding Agency. VTDOT: Newbury WCRL(20) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Located along the Washington County Railroad Connecticut River Line at MP 68.86 in the Town of Newbury and crossing over Harriman Brook. The scope of work for this project includes the removal and replacement of the steel superstructure and concrete bridge seats and backwalls. The anticipated duration of work will be one construction season with one 5 day track closure with exclusive track access for construction.

GC Bidding

Bridges / Tunnels

$2,500,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
47
Bidding Soon
840
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2026

April 1, 2027

Project location map

Multiple Locations, Newbury, VT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed