BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sulphur, Oklahoma. Completed plans call for site work for a water / sewer project.

CDBG #19512 CDBG 24 The replacement of existing 3" water main with a new 8" PVC C900 DR 18 water main that will connect to an existing 8" along State Highway 7 from County Road 110 on the west end of Chickasaw Trail Road on the east end. 1 10,130.00 L.F. 8" PVC C900 DR 18 Water Main 2 380.00 L.F. Directional Bore & Install 14" PE SDR 11 Casing 3 380.00 L.F. Install 8" PE SDR 11 Water Main 4 8.00 Ea. PVC to PE Transition 5 45.00 L.F. Bore & Install 14" Steel Casing, 0.188" Thick 6 1.00 Ea. 3" Interconnection 7 2.00 Ea. 3" Cut & Plug 8 1.00 Ea. 2" Interconnection 9 1.00 Ea. 2" Gate Valve & Box 10 1.00 Ea. 8" Interconnection 11 3.00 Ea. 8" Gate Valve & Box 12 2.00 Ea. 8"x45 Bend 13 1.00 Ea. 8"x90 Bend 14 1.00 Ea. 8"x8"x8" Tee 15 1.00 Ea. 8"x8"x2" Tee 16 1.00 Ea. 8"x3" Reducer 17 4.00 Ea. 1" Combination Air Valve 18 5.00 Ea. Single Short Service - SSS 19 66.00 S.Y. Gravel Repair 20 1.00 L.S. Erosion Control 21 1.00 L.S. Hydrostatic Pressure Testing and Disinfection Bids must include assurances that the following provisions will be complied with: Federal Labor Standards Provisions - US Department of Labor, 29 CFR 5; Subpart A - Davis-Bacon Act for the use of the appropriate Davis-Bacon prevailing wage rate(s) for the county and state in which the project is located; and Subpart B, Fringe Benefit Provisions. HUD Section 3, 24 CFR Part 75 - public construction projects assisted under HUD programs that provide financial assistance when the total amount of HUD assistance to the project exceeds a minimum funding threshold at $200,000 requires that to the greatest extent feasible opportunities for training and employment be provided to lower-income residents of the project area and contracts for work in a substantial part by persons residing in the area of the project. Section 109 - of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin, sex, religion, age, disability, or family status be excluded from participation in, be denied the benefits of, or be subjected to discrimination. Non-Segregated Facilities - Certification that assures the bidder does not maintain or provide any segregated facilities. Executive Order 11246 - Equal Employment Opportunity (EEO); provisions require affirmative action and prohibits federal contractors from discriminating on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin. Minority Business Enterprise and Women Business Enterprise provisions which encourage minority owned business and women owned businesses to bid on the project. Circular 570 - Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning reason therefore, and to make the award in the best interest of the owner. Bid must be awarded to the lowest, responsive, and responsible bidder pursuant to the Oklahoma State Competitive Bidding Act of 1974 as amended.

GC Bidding

Water / Sewer

$500,000.00

Public - County

Site Work

22

20

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
21
Bidding Soon
348
All Active Projects
138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 5, 2025

img_map_placeholder

State Hwy 7, Sulphur, OK

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.