Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 18, 2025 at 7:00 PM

Updated February 19, 2025

Site work for a water / sewer project in Sulphur, Oklahoma. Completed plans call for site work for a water / sewer project.

Murray County Water Line Relocation 1,383.00 L.F. 4" PVC C900 DR18 Water Main 350.00 L.F. Install 4" HDPE SDR 11 Water Main inside 10" HDPE SDR 11 Casing 350.00 L.F. Directional Bore & Install 10" HDPE SDR 11 Casing 1.00 EA. 4' Dia. Manhole with 4" Gate Valve & (2) 3/4 " Corp. Stops and Sampling Taps 1.00 EA. 4" Gate Valve & Box 2.00 EA. 3" Interconnection 2.00 EA. 3" Cut & Plug 2.00 EA. 4" x 3" Reducer 2.00 EA. 4" x 11.25 Bend 2.00 EA. 4" x 22.5 Bend 2.00 EA. PVC to PE Transition 1.00 L.S. Pressure Test & Disinfection

Bid Results

Water / Sewer

$85,200.00

Public - County

Site Work

12

9

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
84
Bidding Soon
936
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

Multiple Locations, Sulphur, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed