Published March 6, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Sulphur, Oklahoma. Completed plans call for site work for a water / sewer project.

CDBG #19512 CDBG 24 The replacement of existing 3" water main with a new 8" PVC C900 DR 18 water main that will connect to an existing 8" along State Highway 7 from County Road 110 on the west end of Chickasaw Trail Road on the east end. 1 10,130.00 L.F. 8" PVC C900 DR 18 Water Main 2 380.00 L.F. Directional Bore & Install 14" PE SDR 11 Casing 3 380.00 L.F. Install 8" PE SDR 11 Water Main 4 8.00 Ea. PVC to PE Transition 5 45.00 L.F. Bore & Install 14" Steel Casing, 0.188" Thick 6 1.00 Ea. 3" Interconnection 7 2.00 Ea. 3" Cut & Plug 8 1.00 Ea. 2" Interconnection 9 1.00 Ea. 2" Gate Valve & Box 10 1.00 Ea. 8" Interconnection 11 3.00 Ea. 8" Gate Valve & Box 12 2.00 Ea. 8"x45 Bend 13 1.00 Ea. 8"x90 Bend 14 1.00 Ea. 8"x8"x8" Tee 15 1.00 Ea. 8"x8"x2" Tee 16 1.00 Ea. 8"x3" Reducer 17 4.00 Ea. 1" Combination Air Valve 18 5.00 Ea. Single Short Service - SSS 19 66.00 S.Y. Gravel Repair 20 1.00 L.S. Erosion Control 21 1.00 L.S. Hydrostatic Pressure Testing and Disinfection Bids must include assurances that the following provisions will be complied with: Federal Labor Standards Provisions - US Department of Labor, 29 CFR 5; Subpart A - Davis-Bacon Act for the use of the appropriate Davis-Bacon prevailing wage rate(s) for the county and state in which the project is located; and Subpart B, Fringe Benefit Provisions. HUD Section 3, 24 CFR Part 75 - public construction projects assisted under HUD programs that provide financial assistance when the total amount of HUD assistance to the project exceeds a minimum funding threshold at $200,000 requires that to the greatest extent feasible opportunities for training and employment be provided to lower-income residents of the project area and contracts for work in a substantial part by persons residing in the area of the project. Section 109 - of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin, sex, religion, age, disability, or family status be excluded from participation in, be denied the benefits of, or be subjected to discrimination. Non-Segregated Facilities - Certification that assures the bidder does not maintain or provide any segregated facilities. Executive Order 11246 - Equal Employment Opportunity (EEO); provisions require affirmative action and prohibits federal contractors from discriminating on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin. Minority Business Enterprise and Women Business Enterprise provisions which encourage minority owned business and women owned businesses to bid on the project. Circular 570 - Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning reason therefore, and to make the award in the best interest of the owner. Bid must be awarded to the lowest, responsive, and responsible bidder pursuant to the Oklahoma State Competitive Bidding Act of 1974 as amended.

Award

Water / Sewer

$549,095.00

Public - County

Site Work

22

20

23

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Tunneling and Mining, Shaft Construction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
39
Bidding Soon
488
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 5, 2025

img_map_placeholder

State Hwy 7, Sulphur, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements South Pressure Zone Waterline Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.