BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2024 at 7:00 PM

Updated December 13, 2024

Renovation of a municipal facility in Sulphur, Oklahoma. Completed plans call for the renovation of a 5,400-square-foot, two-story above grade municipal facility.

The scope of this project includes, but is not limited to, the following: renovation of a municipal facility. As of November 25, 2024, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. The project consists of a renovation of the Courthouse, 1001 W. Wyandotte Ave, Sulphur, OK. The building is two (2) story is of approximately 5,400 s.f. per level with a 350 s.f. basement and will require interior demolition, new metal stud walls, ceilings, finishes, windows, HVAC, electrical, plumbing and new roof as indicated in the bid documents. Questions concerning the Bid Packages and bidding procedures shall be directed to the CM. Questions concerning the bid documents shall be directed to the office of the Architect, Corner Greer & Assoc., 580.223.1341. A link for the plans and specifications may be obtained from the CM or Architect. Successful subcontractors shall be responsible for purchasing and/or furnishing all plans, specifications and required documents for construction of the project.

Post-Bid

Municipal

$400,000.00

Public - County

Renovation

21

20

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
58
Bidding Soon
710
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 3, 2025

Project location map

1001 W Wyandotte Ave, Sulphur, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.