Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 23, 2024 at 8:00 PM

Updated August 24, 2024

Renovation of an elderly care / assisted living facility in Sulphur, Oklahoma. Completed plans call for the renovation of a elderly care / assisted living facility.

SCOPE OF WORK 1 Contractor to install a new boiler that will provide steam to HVAC system as well as the hot water systems for the west wing resident building. "Refer to Exhibit "A" Photographs 2 Required Specification; Hurst Boiler Model #100-GP2-101-15, surface blowdown valve and skimmer, HP 101 MBH Output 2281, 15 PSI, and a Webster Burner Model #JB2-C-30. 3 Demo and remove existing boiler. 4 Demo and removal of old concrete equipment pad. 5 Installation of new concrete pad with #4 rebar re-enforcement on 16" centers. 6 Replacement of old 6-inch non-return valve. 7 Provide and install materials including but not limited to flue kit, pumps, motors, piping, and insulation. 8 Installation to include state boiler inspection and factory start-up. 9 Haul off existing boiler and materials. Dispose of material in accordance with state and federal regulations Project Location: 304 E. Fairlane Sulphur, OK 73086 Contact Person(s) for Questions: Druey Hall Druey Hall - druey.hall@omes.ok.gov

Bid Results

Elderly Care / Assisted Living

$170,540.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
48
Bidding Soon
908
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

Project location map

304 Fairlane Ave, Sulphur, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed