EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Sulphur, Oklahoma. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Counties: Murray Calendar Days: 150 Days DBE Goal: 15.5 Grade, Drain, Surface, and Bridge County Roads (Reactor Road/drake Road): Reactor Road, From 4.4 Miles North of the Carter County Line Extend North. Drake Road, From the Reactor Road Junction Extend East Near Sulphur. Project Length = 0.372 Miles Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total. Attached is a Certified or Cashier's Check or Bid Bond Equal to Five Percent (5%) of the Bid Made Payable to the Oklahoma Department of Transportation as a Guarantee of Good Faith and Which if the Contract is Awarded to the Undersigned, It is Agreed Will Be Forfeited as Liquidate Damages to the State of Oklahoma in the Event of Failure of the Undersigned to Enter Into Contract and Furnish Satisfactory Bond to the Department of Transportation Within Ten Days After Award. Questions and comments regarding the April 11, 2024 bid opening will be accepted until March 29, 2024. Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. Responses will be posted to the "Pre-bid Questions and Answers" section of the ODOT Contracts & Proposals webpage as they are received. OKDOT - 760 - Grade, Drain, Surface, and Bridge Description of work and location of project: Call Order: 760 STP-250D(043)CI COUNTY ROADS MURRAY JP No.32932(04) GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROADS (REACTOR ROAD/DRAKE ROAD): REACTOR ROAD, FROM 4.4 MILES NORTH OF THE CARTER COUNTY LINE EXTEND NORTH. DRAKE ROAD, FROM THE REACTOR ROAD JUNCTION EXTEND EAST NEAR SULPHUR. STATE OF OKLAHOMA, OKLAHOMA DEPARTMENT OF TRANSPORTATION - By: TIM J. GATZ, Director. This work consists of providing electronic data for material weight tickets of all bituminous material delivered to the project. This work also consists of placing an identifying vehicle number on the driver side and the passenger or rear sides of the delivery vehicle. These provisions do not preclude or dismiss any requirement for paper tickets required by the Standard Specifications or other rules and regulations. Register here haulhub.com/okstatedot/#signmeup to begin using the Departments Electronic Ticketing Portal system. if a commercial development is constructed under NWP 39, and the single and complete project includes the filling of an upland ditch authorized by NWP 46, the maximum acreage loss of waters of the United States for the commercial development under NWP 39 cannot exceed 1/2-acre, and the total acreage loss of waters of United States due to the NWP 39 and 46 activities cannot exceed 1 acre.

Award

Bridges / Tunnels

$1,368,004.00

Public - State/Provincial

Paving, Site Work

42

10

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
37
Bidding Soon
470
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

August 5, 2024

img_map_placeholder

Multiple Locations, Sulphur, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Grade, Drain, Surface, and Bridge

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.