Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 8, 2025 at 8:00 PM
Updated August 9, 2025
Demolition, site work, paving, new construction and renovation of a mixed-use development in Sulphur, Oklahoma. Completed plans call for the demolition of a bridge / tunnel; for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and for the construction of a bridge / tunnel.
6982AF25SS0003, 6982AF25B000005, HFLCEO250131PR PROJECT NUMBER: OK ERFO NP CHIC 2024-1(1) PROJECT NAME: Veterans Lake Trail Bridge PROJECT DESCRIPTION: The project is located along Veterans Lake Trail within the Chickasaw (CHIC) National Recreation Area (NRA) in Murray County, Oklahoma. The proposed improvement is to replace a pedestrian trail bridge that was removed by a tornado April 2024. The existing bridge has been found in Veterans Lake and will need to be removed as well. The existing abutments are intact; however, some of the anchor bolts are bent and the south abutment is cracked. SCOPE OF THE WORK: Constructing the new bridge includes repairing the existing abutments that would be reused to support the replacement bridge, repairing the minor masonry structure, and installing an approximately 130-foot-long and 6-foot-wide prefabricated pedestrian bridge. The replacement bridge would be a prefabricated steel truss bridge with a timber deck, similar in appearance to the original structure. Construction staging would occur at the existing parking lot at the north end of the dam and access provided via the existing trail. Removal of the existing bridge from Veterans Lake would likely involve floating the structure to the parking lots on the east side of the lake and lifting it via crane. The bridge would then be appropriately disposed of. Two parking lots would be utilized as staging areas and provide access for the bridge removal process. It is anticipated this project will be under construction in the Summer of 2025. The project has an estimated completion date of June 2026. Due to weather, no onsite work is to occur from early March to early May. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON MAY 6, 2025 Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions. Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at website *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK 103.05 Partnering. Delete the third paragraph and substitute the following: If the partnering offer is accepted, mutually agree with the CO on the level of organizational involvement and the need for a professional to facilitate the partnering process. Engage the facilitator and other resources for key Contractor representatives and the CO to attend a partnership development and team-building workshop. Hold additional progress meetings upon mutual agreement
Award
Bridges / Tunnels
$565,800.00
Public - Federal
Demolition, New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
July 14, 2025
901 W 1st St, Sulphur, OK
Related To This Project
Sulphur, OK
Bid Date: May 14 2025
Sulphur, OK
Bid Date: Jan 07 2026
Sulphur, OK
Bid Date: Jun 09 2025
Sulphur, OK
Bid Date: Aug 22 2025
Sulphur, OK
Bid Date: Sep 29 2025
Sulphur, OK
Bid Date: Aug 08 2025
Sulphur, OK
Bid Date: Aug 08 2025
Sulphur, OK
Bid Date: Aug 21 2025
Sulphur, OK
Bid Date: Apr 08 2025
Sulphur, OK
Bid Date: Mar 12 2025
Sulphur, OK
Bid Date: Mar 27 2025
Sulphur, OK
Bid Date: Mar 12 2025
Sulphur, OK
Bid Date: Feb 21 2025
Sulphur, OK
Bid Date: Jan 30 2025
Sulphur, OK
Bid Date: Jan 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
