Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2025 at 7:00 PM
Updated February 14, 2025
Site work for a municipal facility in Greenleaf, Wisconsin. Completed plans call for site work for a municipal facility.
A. Contractor shall provide all materials, equipment, and labor to furnish and install a complete landfill gas (LFG) extraction and flare equipment skid(s) to meet the design requirements listed hereafter. Contractor shall provide all materials, equipment and labor needed to furnish, fabricate, test, and transport all materials and equipment as specified. Contractor shall install equipment Contractor shall provide installation, start-up, and testing of all furnished components per manufacturer's guidance, specifications, and drawings to provide a complete and operable system. B. Contractor shall propose a landfill gas extraction and flare equipment to function as a system. Equipment shall be designed by a single manufacturer. C. Furnish and install a control panel for the LFG extraction system and flare. All controls, instrumentation, and equipment shall be pre-wired and tested at the fabrication facility. D. The landfill gas extraction skid and flare equipment shall include at a minimum the items listed below in accordance with these specifications and the attached drawings. 1. Furnish and install pre-fabricated landfill gas extraction skid for outdoor installation. 2. Furnish and install flare skid for installation on proposed exterior concrete pad. 3. Furnish and install pilot ignition system with pilot gas tanks. 4. Furnish and install all electrical wiring and gas supply piping for operation and control of the extraction equipment. 5. Start-up and commissioning. E. The flare shall be capable of combusting landfill gas in accordance with regulations, as well as specifications and drawings. RFB Questions Due: January 20, 2025, by 3:00pm South Landfill Gas Extraction Skid and Flare Installation M/WBE's are encouraged to participate in the bid process.
Post-Bid
Municipal
$500,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2025
March 14, 2025
1258 Mill Rd, Greenleaf, WI
Related To This Project
Greenleaf, WI
Bid Date: Feb 05 2025
Greenleaf, WI
Bid Date: Apr 08 2025
Greenleaf, WI
Bid Date: Apr 07 2025
Greenleaf, WI
Bid Date: May 14 2025
Greenleaf, WI
Bid Date: May 24 2025
Greenleaf, WI
Bid Date: Jul 09 2025
Greenleaf, WI
Bid Date: Sep 05 2025
Greenleaf, WI
Bid Date: Sep 23 2025
Greenleaf, WI
Bid Date: Jan 03 2025
Greenleaf, WI
Bid Date: Sep 09 2024
Greenleaf, WI
Bid Date: Aug 14 2024
Greenleaf, WI
--
Greenleaf, WI
Bid Date: Mar 11 2025
Greenleaf, WI
--
Greenleaf, WI
Bid Date: May 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
