Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 24, 2025 at 7:00 PM
Updated January 25, 2025
Renovation of a service station / car wash facility in Kings Bay, Georgia. Completed plans call for the renovation of a service station / car wash facility.
Project Location: 1021 USS Daniel Boone Ave Kings Bay, GA 31547 Project Description: Kings Bay Car Wash system replacement Range of Magnitude: $132,000 to $150,500 The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay. Work shall include but is not limited to the following: 1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility "pot holing") as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC). 2. Materials: The Contractor shall provide all materials, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. 3. Disposal: The Contractor is responsible for the disposal of all waste materials generated as part of this project and shall remove all waste and equipment to an offsite area. All and laydown area will be designated for the new equipment and disposal containers. Also, the Contractor shall clean up the work site daily to the satisfaction of the POC. 4. Demolition: The Contractor shall remove all materials not required for the operation of the proposed systems within all four (4) existing car wash bays and supporting spaces, while retaining all code required items. The existing Self-Service Multi-Pressure Car Wash system including water hoses and plumbing lines, all existing bay controls and meters, and all existing 360 degree and 180 degree pressure booms. The Contractor shall remove the existing bill changer and dispose of as stated above. The Contractor shall also remove and dispose of all existing operational wall signage, and all wall accessories typical for all four (4) bays. 5. Renovation: The Contractor shall furnish install a new Self-Service Multi-Pressure Car Wash System. The new Self-Service Car Wash System shall include all new hoses and plumbing lines to support the new system. The system shall include the minimum of the following functions: Tire Cleaner Presoak High Pressure Soap Wax Rinse Spot-Free Rinse Bug Off Foam Brush Foam Conditioner 6. The Contractor shall provide all the chemicals and detergents for the duration of start-up testing and inspections to ensure the Self-Service Car Wash System is fully operational. 7. The Contractor shall furnish and install four (4) new 360-degree Pressure Spray Wand Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. The Contactor shall install four (4) new 180- degree Foam Conditioner Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. 8. Renovation: The Contractor shall furnish and install in all four (4) bays the following accessories: Foam Brush Buckets High Pressure Wand Holders Bay Hooks Matt Clamps Menu Board and Operational Signage 9. Renovation: The Contractor shall furnish and install four (4) new Self-Serve Car Wash POS Control Meters. The new Bay Control Meters shall have a coin and credit card option. The individual credit card reader must be compatible with NAYAX payment and management system. The Contractor shall insure that the Point of Sale (POS) system is compatible with the Installation Morale Welfare and Recreation (MWR) department's existing NAYAX system. The Government will provide 3rd party encryption and process separately from this contract. 10. Renovation: The Contractor shall install a new weatherproof electrical vending machine that will be compatible with the same payment option as line item ten (10) above. The vending machine options shall include items such as: Towels Wipes Protectants Shines Cleaners Deodorizers Air Fresheners 11. The Contractor shall furnish and install a new bill changer matching existing unit configurations at the same location as existing. 12. Renovation: The Contractor shall install all new equipment and related accessories, as per manufacturer's installation guidelines. If the Contractor is quoting an "equal" to the listed product herein, the Contractor shall submit complete specifications on the "equal" product with the response to this RFQ. The specifications will be reviewed by the POC and Contracting Officer (KO) for possible use on this project. 13. Submittal: The Contractor shall submit a Signage Graphics package to the POC for approval fifteen (15) days prior to fabrication. All new merchandising and operational signage must comply with the MWR Brand Standards. 14. Preservation: The Contractor shall protect existing adjacent materials, especially wall and floor surfaces, from any and all damage during the work, by utilizing walk pads, construction screens and other industry best practices protection methods. 15. Restoration: The Contractor shall repair and/or replace all facility elements impacted and/or damaged by work, to the satisfaction of the POC. The Contractor shall patch, paint and/or otherwise restore all building materials, including but not limited to, wall and floor surfaces damaged by work; to the satisfaction of the POC. 16. Warranties: The Contractor shall provide a warranty on all materials i.e chemicals and detergents/equipment and labor for a period of one (1) year, or longer if standard for materials/equipment, from the date of acceptance by the KO. The Contractor shall refer to Section H and I for additional information regarding warranties and extended warranties. 17. The Contractor shall provide an Operations and Maintenance (O&M) Manual to the POC and KO, as instructed. Also, the Contractor shall provide instruction and training to the POC, MWR facility staff and PWD representatives on the care and maintenance of all installed equipment and systems, using the O&M Manual as the training basis. Site Inspection The Contractor shall examine the site and determine for themselves the existing conditions and general character of the site. Claims for additional costs due to conditions that could have been verified by site investigation will not be authorized. Contractor shall contact the POC to schedule the Site Inspection. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Service Station / Car Wash
$150,500.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2025
February 24, 2025
1021 USS Daniel Boone Ave, Kings Bay, GA
Related To This Project
Kings Bay, GA
Bid Date: Feb 06 2025
Kings Bay, GA
Bid Date: Mar 27 2025
Kings Bay, GA
Bid Date: May 07 2025
Kings Bay, GA
Bid Date: Apr 25 2025
Kings Bay, GA
Bid Date: Apr 30 2025
Kings Bay, GA
--
Kings Bay, GA
--
Kings Bay, GA
Bid Date: Sep 23 2022
Kings Bay, GA
Bid Date: May 26 2023
Kings Bay, GA
Bid Date: May 11 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
