BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2025 at 7:00 PM

Updated January 24, 2025

Site work and renovation of a civil project in Lemoore Naval Air Station, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work includes Replacing existing 8 inch diameter domestic water pipe with new 12 inch diameter domestic water pipe from Tanks 52 and 53 to Building 50 pump manifold and incidental related work. In order to determine the best value proposal for this project, the Government will evaluate all contractors using price only. The Government will evaluate the total price for CLIN 0001 Building 50 project. Award will be made to the responsible offeror whose proposal is determined to be the LOWEST PRICE. Price will be evaluated on the basis of fair and reasonable. A price which is found to be either unreasonably high or unrealistically low in relation to the proposed work may result in the proposal being eliminated from competition, either on the basis that the offeror does not understand the requirement or that it has made an unrealistic proposal. Additionally, past performance evaluations obtained from previous and/or existing task orders under your contract will also be considered. Liquidated Damages-Construction (Sept 2000) (a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $500.00 for each calendar day of delay until the work is completed or accepted. (b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. Range of Magnitude As specified under FAR 36.204 Disclosure of the magnitude of construction projects, the range of magnitude is between $1,000,000.00 and $5,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. RFI must be submitted and received by 03 Jan 2025 at 08:00 A.M. (Pacific Time). Project No. - 10500917

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Renovation, Site Work

28

20

16

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
62
Bidding Soon
734
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

March 24, 2025

Project location map

700 Avenger Ave, Lemoore Naval Air Station, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.