BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 19, 2025

Site work for a power facility in Rocky Mount, North Carolina. Completed plans call for site work for a power facility.

Installation of Substation 10 and Substation 12, 69 kV Breaker Upgrades Any Proposal received after that time will be promptly returned to the Bidder unopened. Proposals can be hand delivered to the Purchasing Office at 331 South Franklin St., Rocky Mount, NC 27804 or the First Floor Atrium. Name and Address of the Bidder, Its License Number (if a License is Required by the State), and the Following Description Must Appear on the Envelope in With the Proposal is Submitted: "bid for the Installation of the Substation 10 and Substation 12, 69 Kv Breaker Upgrades Rocky Mount, North Carolina Question Deadline 01/27/2025 at 4:00 PM ET Questions and comments can be submitted to Alicia Gaines (alicia.gaines@rockymountnc.gov). City of Rocky Mount reserves the right to reject any or all bids. Proposals and all supporting instruments must be submitted on and in the format of the forms furnished in the Form of Proposal of these bid documents and must be delivered in a sealed envelope addressed to the Owner. Proposals must be filled in with indelible ink. No alterations or interlineations will be permitted unless made before submission and initialed and dated. Prior to the submission of the Proposal, the Bidder shall make and shall be deemed to have made a careful examination of the bid documents on file with the Owner and with the Engineer and of all other matters that may affect the cost and the time of the work. All construction under this Contract must be completed on or before Monday, June 2, 2025. Substation energization date is tentatively scheduled for June 9, 2025. Each Proposal shall be accompanied by cash, cashier's check, or certified check drawn on a bank insured with the Federal Deposit Insurance, payable to the Owner, in an amount not less than ten percent (10%) of the total bid as a guarantee that a Purchase Order, if awarded, will be accepted. In lieu thereof, a Bid Bond may be submitted by the Bidder in an amount not less than ten percent (10%) of the total bid(see attached Bid Bond form). The total bid price for which the ten percent(10%) applies shall be the total of all schedules. The Owner reserves the rights to (1)waive minor irregularities or minor errors in any Proposal if it appears to the Owner that such irregularities or errors were made through inadvertence. Any such irregularities or errors so waived must be corrected on the Proposal prior to its acceptance by the Owner; (2) reject any or all Proposals and to hold any or all Proposals for a period of sixty (60)days from the date of opening thereof; (3) accept the bid, in its opinion, that represents the best value for the Owner, regardless of whether such bid is the lowest price; and (4) award Contracts to Bidder(s) for any Schedule(s)individually or collectively from the Bid Schedules.

Bid Results

Power Plant

$316,197.00

Public - City

Site Work

50

15

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
110
Bidding Soon
1,413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

March 6, 2025

Project location map

2716 Berkley Dr, Rocky Mount, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.