Published February 22, 2025 at 7:00 PM

Updated February 23, 2025

Site work and paving for a mixed-use development in Bolton, Massachusetts. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The scope of work for this project consists of an all-weather playing field to accommodate soccer, field hockey and lacrosse, along with related amenities such as fencing, spectator accommodations, retaining walls, ADA-accessible surfaced paths and all related incidental work. Funding of the project is by an MVP Action Grant, and includes Nature Based Solutions such as low impact development stormwater treatment, planting of native grasses, shrubs and trees, and stabilized stone dust paths. Bids must be enclosed in a sealed envelope bearing the name and address of the Bidder and addressed to Marie Sobalvarro, Town Administrator. All bids must be submitted on the forms included in the specifications and "Bid # 2025-01, Derby Field Improvements, Bolton, MA" must be marked on the outside of the envelope. Electronic or facsimile submittal of bids will not be accepted A bid deposit in the form of a bid bond, or certified check, or cashier's check issued by a responsible bank or trust company, payable to the Town of Bolton shall accompany the bids. The bid bond shall be (1) in a form satisfactory to the Town, (2) with a surety company qualified to do business in the Commonwealth and satisfactory to the Town and (3) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The amount of the bid deposit shall be at least equal to 5% of the total amount of the bid The Town of Bolton reserves the right to reject any or all bids, to waive any informality and to make the award as may be deemed to be in the best interest of the Town. A. This section of the specification covers the control of dust via water or other means, complete and in place. B. Magnesium Chloride or Calcium Chloride shall NOT be used nor shall mulch applications be acceptable. A. This section of the specification covers the provision, operation, and removal of temporary watering system(s) for the following: 1. All buffer plantings areas as shown on plans or as otherwise directed, complete and in place. B. All shrub and Tree plantings will be watered in accordance to Section 32 93 00 - PLANTS. The project Future Resilient Field at Derby is a Municipal Vulnerability Preparedness Programfunded project involving the reconstruction ofan existing sportsfield, spectator area, and installation ofa native garden area that will reclaim the area between thefield and top ofslope. This projectshall include low impact developmentstormwater infrastructure, and a natural turffield specifically constructed to encourage soil regeneration and climate resiliency. A. Work under the Item shall be for the services of an independent Environmental Monitor (EM) to oversee all sediment and erosion control measures throughout the duration of the project, including conformance to the requirements of the SWPPP. B. The EM shall be responsible for the following: 1. Review and have a comprehensive knowledge of the environmental permits relevant to the specific mitigation work being done so as to ensure compliance throughout the duration of the contract. 2. Identify and inform the Contractor and Designer of unique site conditions which may require adjustments to the schedule, design, or construction methods. For example, wildlife nesting, illegal dumping, or rare species. 3. Identify and inform the Contractor and Designer of any sediment or erosion control problems observed within mitigation areas. 4. Advise so as to avoid impacts to adjacent areas and regulated wetland resources. 5. Participate in necessary meetings as required by permits and when requested by the Bolton Conservation Commission (BCC) or the Designer. C. The EM shall have the authority to stop construction to ensure that erosion controls are in place and maintained at all times , and/or if the EM determines that work is not being conducted in accordance with the plans and submissions approved by the Commission or this Order of Conditions.

Bid Results

Playgrounds / Parks / Athletic Fields

$515,800.00

Public - City

Paving, Site Work

20

18

4

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Special Purpose Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Irrigation, Planting, Planting Preparation, Soil Preparation, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
212
Bidding Soon
3,461
All Active Projects
1,541
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

February 24, 2025

img_map_placeholder

100 Mechanic St, Bolton, MA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Derby Field Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.