BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated February 20, 2025

Site work and paving for a civil project in Farmington, Utah. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

**As of February 19, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Farmington City is requesting proposals for the construction of the Lower Farmington Creek Trail Project. This project consists of improvements to the existing Farmington Creek Trail, as well as reroutes to the existing trail which are unsustainable. The project includes new trail construction, trail restoration, trail switchbacks, rock steps, rock stairways, rock retaining walls, bench cuts, fill material, standard culverts with rock headwalls, stair set, bridge construction, etc. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. All questions shall be submitted via the U3P website by January 23, 2025. For questions regarding this project, please contact Russell Coons at (801) 939-9276 or email rcoons@farmington.utah.gov. LIQUIDATED DAMAGES Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement. Substantial Completion: Contractor shall pay Owner $500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete. Contract Times: Days The Work shall be substantially completed and billed by September 30, 2025. Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions by September 30, 2025.

Bid Results

Roads / Highways

$404,044.00

Public - City

Paving, Site Work

13

15

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
79
Bidding Soon
1,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 27, 2025

Project location map

Farmington Creek Trail, Farmington, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.