Published February 19, 2025 at 7:00 PM
Updated February 20, 2025
Site work and paving for a civil project in Farmington, Utah. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
**As of February 19, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Farmington City is requesting proposals for the construction of the Lower Farmington Creek Trail Project. This project consists of improvements to the existing Farmington Creek Trail, as well as reroutes to the existing trail which are unsustainable. The project includes new trail construction, trail restoration, trail switchbacks, rock steps, rock stairways, rock retaining walls, bench cuts, fill material, standard culverts with rock headwalls, stair set, bridge construction, etc. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. All questions shall be submitted via the U3P website by January 23, 2025. For questions regarding this project, please contact Russell Coons at (801) 939-9276 or email rcoons@farmington.utah.gov. LIQUIDATED DAMAGES Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement. Substantial Completion: Contractor shall pay Owner $500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete. Contract Times: Days The Work shall be substantially completed and billed by September 30, 2025. Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions by September 30, 2025.
Bid Results
Roads / Highways
$404,044.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
February 27, 2025
Farmington Creek Trail, Farmington, UT
Related To This Project
Farmington, UT
Bid Date: Jan 29 2025
Farmington, UT
Bid Date: Feb 11 2025
Farmington, UT
Bid Date: Jan 28 2025
Farmington, UT
Bid Date: Mar 04 2025
Farmington, UT
--
Farmington, UT
Bid Date: Mar 06 2025
Farmington, UT
Bid Date: Mar 27 2025
Farmington, UT
Bid Date: Apr 22 2025
Farmington, UT
Bid Date: Jan 23 2025
Farmington, UT
Bid Date: Nov 26 2024
Farmington, UT
Bid Date: Nov 21 2024
Farmington, UT
Bid Date: Sep 25 2024
Farmington, UT
Bid Date: Oct 28 2024
Farmington, UT
Bid Date: Oct 22 2024
Farmington, UT
Bid Date: Oct 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.