BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 6, 2025

Site work for a road / highway in Sturgeon County, Alberta. Completed plans call for site work for a road / highway.

Range Road 232 Reconstruction 0.7 km south of Highway 37 to Highway 37 Generally, the work includes, but is not limited to the following: Traffic Accommodation; Clearing and Mulching; Earthworks and Grading, including Common and Borrow Excavation; Remove and Dispose of Waste Material; Rebuilding Existing Residential / Farm Approaches; Gravel Surfacing; Miscellaneous Removals, including Guardrail, Culverts, and Fence; Culvert Installation; Granular Base Course; Erosion and Sediment Control, including Silt Fencing; Ditch Cleaning; Geotextile; Class 1 Riprap; Hot mix Asphalt Concrete Paving; Topsoil Placement and Seeding; Sign Installation; and Line Painting. Documents can be obtained from https://sturgeoncounty.bidsandtenders.ca/ Bid values are undisclosed.

Bid Results

Roads / Highways

$1,000,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
30
Bidding Soon
556
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

April 1, 2025

Project location map

Multiple Locations, Sturgeon County, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.