BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2025 at 7:00 PM

Updated January 31, 2025

Renovation of a residential development in East Taunton, Massachusetts. Completed plans call for the renovation of a residential development.

Stair Replacement at Caswell Grove Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 01/22/2025 at 5:00 PM ET All bidding Requests for Information (RFIs) shall be submitted online Unless specified elsewhere, the Contractor shall be responsible for: (1.) All cutting and patching required for the project construction. (2.) Products and installation for patching and extending Work. (3.) Transition and adjustments. (4.) Repair of damaged surfaces, finishes, and cleaning. (5.) Coordination of any cutting and patching required by subtrades.

Bid Results

Residential Subdivision

$183,000.00

Public - City

Renovation

11

13

7

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
627
Active Projects
337
Bidding Soon
3,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

February 28, 2025

Project location map

417 Middleboro Ave, East Taunton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.