BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2025 at 7:00 PM

Updated January 31, 2025

Site work and paving for a mixed-use development in Athens, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Question Deadline 01/20/2025 All questions about the meaning or intent of the Contract Documents are to be directed to Marathon Technical Services, LLC. Questions received less than three days prior to the date for opening of Bids may not be answered. The overall description of the project, to be completed under one contract, is the reconstruction of approximately 425 feet of an urban street section. In general, the work includes removal of existing drive aprons, sidewalk, curb/gutter and pavement, and the reconstruction of the roadway with drain tile, base course, curb/gutter, aprons, sidewalk, pavement, and replacement of sewer and water mains and laterals. The project start date is April 15, 2025 and the substantial completion date is set at August 8, 2025. The approximate units of the major work items are as follows; 1) Remove Existing asphalt, curb, aprons, and sidewalk - 2,214 sq. yds. 2) Base Course -1,025 cu. yds. 3) Concrete Curb and Gutter - 789 feet 4) Concrete Sidewalk and Apron - 352 sq. yds. 5) Draintlle - 822 feet 6) Asphalt Pavement - 288 tons 7) Sanitary Sewer Replacement -197 feet 8) Water Main Replacement - 520 feet 9) Lateral Replacement - 5 each This project Is not subject to State of Wisconsin prevailing wage rates. No bids shall be considered unless submitted on the official proposal form. Bids shall be submitted with a minimum 5% bid bond. The Village of Athens reserves the right to reject any or all bids, to waive any informality in the bidding, and to award the contract in the best interest of the village. No bid shall be withdrawn for a period of 60 days after the actual time of opening the bids. A Performance Bond and a Payment Bond, each in the amount of 100 percent (100%) of the total bid price, together with an executed Agreement in the form prescribed by the village, will be required of the successful bidder.

Award

Roads / Highways

$234,181.00

Public - City

Paving, Site Work

19

11

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
63
Bidding Soon
573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

April 15, 2025

Project location map

Maple St, Athens, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.