Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 5, 2026 at 7:00 PM
Updated January 6, 2026
Renovation of a military facility in Aberdeen Proving Ground, Maryland. Conceptual plans call for the renovation of a military facility.
THIS SOURCES SOUGHT NOTICE IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR BIDS/PROPOSAL. PROJECT: Solicitation No. W912DR25RA009: Test Maintenance Fabrication Facility, Aberdeen Proving Ground, Maryland. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow-up information requests. This is a SOURCES SOUGHT NOTICE for Market Research ONLY to determine the availability of Brand Name Items. The United States Army Corps of Engineers, Baltimore District intends to include the following proprietary items in a request for proposal for a construction contract acquisition under the authority of FAR 6.302-5(a)(2)(ii), Authorized or required by statute. This project may include a Brand Name only component, as described below, unless the results of this sources sought notification indicates otherwise. This notification serves three (3) purposes: (1) to notify potential Offerors of the Government's intent to solicit a brand name only component under a future construction project; (2) to identify potential sources that can provide the brand name only item and/or equivalent; (3) notification of the Army's intent to contract sole source for a Brand Name Only, if the market is unable to provide 'equivalent' products. In the event no equivalent equipment exists, the Brand Name Only justification will be issued pursuant to FAR 6.302-5(a)(2)(ii). A subsequent market survey will not be published in support of a Justification and Approval (J&A) for sole sourcing the resultant product(s) or system(s) in the event an equivalent product is not submitted for consideration. In such instances, the brand name or equal component will be embedded in the construction project. Only that part of the project requiring brand name components will be sole sourced if no sources are able to prove an equal product. SUMMARY OF REQUIREMENT: The construction project will include Brand Name only equipment as follows: Fire Department Radio Transmitter: to be sole supplied by AES Corporation. The new facility is required by Code (NFPA 72, UFC 3-600-01, UFC 4-021-01, and UFC 4-010-01) to include a fire alarm system capable of detecting fire and/or smoke and instructing occupants to evacuate the facility upon such detection. This system must be connected to the base-wide system. Code does not permit this system to be stand-alone; it must also send its signals to a central receiving station operated by the Aberdeen Proving Ground Fire Department. These signals must be sent automatically due to the using hot-work materials being used within the facility and will not be always occupied by personnel trained in investigating potential fires and alerting the appropriate first responders and firefighters. Chillers: to be supplied by York Company. Per IMCOM Policy Memorandum dated 24 December 2023 - Enterprise Heating, Ventilation & Air Conditioning (HVAC) Chiller Category Intelligence Report (CIR) Course of Action (COA) Implementation, York is the selected manufacturer for APG. Two (2) nominal 100-ton air-cooled chillers (each sized for 60% of the design peak load) will provide cooling for the Fan Coil Units (FCU) and Air Handling Units (AHU). Chilled water distribution will utilize primary / secondary pumping. Each primary pump will be sized to match the flow through a single chiller. Both secondary chilled water pumps will be sized for full system flow in order to provide redundancy. The chilled water system will circulate 30% propylene glycol solution throughout the system. This will allow the system to operate during below freezing outside air conditions. It will also preclude the need for heat trace on exterior exposed chilled water piping. METASYS HVAC Controls: to be sole supplied by Johnson Controls. The control system for this facility shall be connected to the base-wide Johnson METASYS Direct Digital control (DDC) System to manage and control the new HVAC equipment. This will allow consistent monitoring and control of humidification/dehumidification. The Building Automation System (BAS)/Utility Monitoring and Control System (UMCS) control system and DDC will utilize the BACnet communications protocol via the campus-wide Metasys NIPR network provided by the Network Enterprise Center (NEC) for transport to the Building Operations and Command Center (BOCC) for integration into the base-wide UMCS monitored remotely at the BOCC. Interested vendors must show clear and convincing evidence that alternatives to the specified items exist. Interested vendors wishing to be considered by the Government as described above must provide a copy of its brochure and any other capability statements/data no later than 09 April 2025, 11:00 AM EDT, to Contract Specialist, Amber Rose, U.S. Army Corps of Engineers, Baltimore District, Contracting Division, via email to amber.L.rose@usace.army.mil. This is a market survey and notification of intent only. This is not a request to respond to a solicitation. A determination by the Government to compete this proposed contract based upon responses to this notice is solely within the direction of the Government. As of January 5, 2026, an issuance of short-listed firms has not been released. A contractor selection timeline has not been disclosed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$100,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2027
To Be Determined, Aberdeen Proving Ground, MD
Related To This Project
Aberdeen Proving Ground, MD
--
Aberdeen Proving Ground, MD
--
Aberdeen Proving Ground, MD
Bid Date: Jun 09 2025
Aberdeen Proving Ground, MD
Bid Date: Dec 02 2025
Aberdeen Proving Ground, MD
Bid Date: May 12 2025
Aberdeen Proving Ground, MD
Bid Date: Aug 16 2025
Aberdeen Proving Ground, MD
Bid Date: Sep 26 2025
Aberdeen Proving Ground, MD
Bid Date: Aug 21 2025
Aberdeen Proving Ground, MD
--
Aberdeen Proving Ground, MD
Bid Date: Nov 26 2024
Aberdeen Proving Ground, MD
--
Aberdeen Proving Ground, MD
--
Aberdeen Proving Ground, MD
Bid Date: Sep 06 2024
Aberdeen Proving Ground, MD
Bid Date: Sep 05 2024
Aberdeen Proving Ground, MD
Bid Date: Aug 22 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
