BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 11, 2025

Site work and paving for a mixed-use development in Greenville, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

MetroConnects proposes construction of 4,953-LF of 8" PVC, 239-LF of 8" DIP, 647-LF of 12" DIP, 224-LF of Cured-in-Place 15" gravity sewer line, 27 manholes, 15-VF of drop connection, replacement of 325-SY walkways-driveway aprons and 100' of concrete curb and gutters, tying in 9,232-LF of Metro and private 6" services. 8,615' of gravity sewer & 120-CY of manholes to be abandoned. Project Location: Area of Union Bleachery Mill Village near SC-253 @ Old Buncombe Rd in Greenville County

Post-Bid

Water / Sewer

$400,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
73
Bidding Soon
1,079
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

March 12, 2025

Project location map

Old Buncombe Rd, Greenville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.