Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

Site work and paving for a mixed-use development in Lombard, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project will consist of the reconstruction of Hawthorn Circle and Cherry Lane. The total length of the project is approximately 2,000 linear feet. The scope of work includes the removal of existing pavement, base course, and subbase to the proposed subgrade elevation. The roadways will be replaced with a 9" subbase granular material, a 4" hot-mix asphalt binder course, and a 2" hot-mix surface course. Furthermore, curb and gutter removal and replacement, sidewalk replacement, driveway construction, storm sewer construction, water main replacement and lining, and street lighting will all be included in the scope of work for this project. Alternate bid items are included for full replacement of the sanitary sewer main or a combination of replacement and lining of the sanitary sewer main. All of the above, as well as other project details, are further described in the contract documents for the said work prepared for the Village of Lombard by Civiltech Engineering, Inc. Est. Value Notes: 3 to 4 million dollars Question Deadline 02/14/2025 at 4:00 PM CT Any question(s) must be submitted in writing to David Kreeger at dkreeger@civiltechinc.com . Site Directions: These streets are located north of Wilson Avenue, west of Westmore-Meyers Road and Lombard Circle, just south of Magnolia Circle, just east of Madison Meadows Park. Please submit the IDOT pre-qualification of bidders to Ray Schwab, Civil Engineer II, at schwabr@villageoflombard.org. Est. Completion Date: Oct. 25, 2025 Pre-Qualification: Yes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Under Construction

Roads / Highways

Public - City

Paving, Site Work

98

5

2

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
561
Active Projects
294
Bidding Soon
3,757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

April 28, 2025

Project location map

Cherry Ln & Hawthorn Cir, Lombard, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed