Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2025 at 8:00 PM
Updated June 10, 2025
Site work and paving for a mixed-use development in Lombard, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The project will consist of the reconstruction of Hawthorn Circle and Cherry Lane. The total length of the project is approximately 2,000 linear feet. The scope of work includes the removal of existing pavement, base course, and subbase to the proposed subgrade elevation. The roadways will be replaced with a 9" subbase granular material, a 4" hot-mix asphalt binder course, and a 2" hot-mix surface course. Furthermore, curb and gutter removal and replacement, sidewalk replacement, driveway construction, storm sewer construction, water main replacement and lining, and street lighting will all be included in the scope of work for this project. Alternate bid items are included for full replacement of the sanitary sewer main or a combination of replacement and lining of the sanitary sewer main. All of the above, as well as other project details, are further described in the contract documents for the said work prepared for the Village of Lombard by Civiltech Engineering, Inc. Est. Value Notes: 3 to 4 million dollars Question Deadline 02/14/2025 at 4:00 PM CT Any question(s) must be submitted in writing to David Kreeger at dkreeger@civiltechinc.com . Site Directions: These streets are located north of Wilson Avenue, west of Westmore-Meyers Road and Lombard Circle, just south of Magnolia Circle, just east of Madison Meadows Park. Please submit the IDOT pre-qualification of bidders to Ray Schwab, Civil Engineer II, at schwabr@villageoflombard.org. Est. Completion Date: Oct. 25, 2025 Pre-Qualification: Yes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Under Construction
Roads / Highways
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2025
April 28, 2025
Cherry Ln & Hawthorn Cir, Lombard, IL
Related To This Project
Lombard, IL
Bid Date: Jan 10 2025
Lombard, IL
Bid Date: Jan 22 2025
Lombard, IL
Bid Date: Feb 04 2025
Lombard, IL
Bid Date: Mar 06 2025
Lombard, IL
Bid Date: Mar 21 2025
Lombard, IL
Bid Date: Apr 04 2025
Lombard, IL
Bid Date: Sep 19 2025
Lombard, IL
Bid Date: Apr 17 2025
Lombard, IL
Bid Date: Jan 03 2025
Lombard, IL
Bid Date: Jan 03 2025
Lombard, IL
Bid Date: Nov 25 2024
Lombard, IL
--
Lombard, IL
Bid Date: Nov 25 2024
Lombard, IL
Bid Date: Nov 25 2024
Lombard, IL
Bid Date: Oct 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
