BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work and paving for a transportation facility in Oroville, Washington. Working plans call for site work for a transportation facility; and for paving for a transportation facility.

The owner has selected a Design Builder. A timeline for construction has not yet been established The scope of work for the desired consulting services includes design engineering, project management, management of supporting programs (including, but not limited to the DBE Program), and construction management as well as all portions of Federal airport grant process from project pre-application through project closeout. Selection criteria contained in the Federal Aviation Administration Advisory Circular 150/5100-14, as amended, will be applied in the following order of importance: 1. Recent airport experience and knowledge of projects similar to those referenced above. 2. Interest shown. 3. Ability to meet schedules. 4. Ability to keep work within a budget. 5. Qualifications of project manager and technical staff assigned to the project. 6. References It is anticipated that these improvements would take place over a five year period.

Pre-Construction/Negotiated

Transportation Terminals

$4,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
5
Bidding Soon
276
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

May 30, 2025

Project location map

To Be Determined, Oroville, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.