BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 31, 2025 at 7:00 PM

Updated February 1, 2025

Renovation of an educational facility in Exton, Pennsylvania. Completed plans call for the renovation of a educational facility.

Collegium Charter School - Boiler Replacement; 500 Bldg 25% deposit upon contract acceptance. Net 30 days after installation. Question Deadline 01/21/2025 at 3:00 PM ET Deadline to submit Questions Online Portal Release Date: Thursday, January 9, 2025 @ 9:00am Response Date: Tuesday, January 28, 2025 @ 3:00pm Project start date: ASAP upon contract acceptance Specifications o Demo and remove a quantity of two (2) Camus 1.0 MBH High Efficiency Boilers from site and dispose of properly. o Furnish and install a quantity of two (2) Lochinvar Knight Model CCN 999 MBH XL Natural Gas, High Efficiency Boilers 1.0 MBH (no substitutions are allowed) o Furnish electrical connections to existing electrical system o Extend existing concrete pads to facilitate new boilers with reinforced rebar to existing pads o Adjust main gas regulator in mechanical room as needed for proper gas supply to boilers (regulator is in mechanical room) o Demo intake duct from header to old unit o Furnish and install new intake duct from header to new units o Furnish and install 6' of stainless-steel breaching from boiler to header. Inspect breaching and supply owner with pictures for record. o Demo all copper piping to valves at loop o Furnish and install all new copper piping from boilers to valves at loop using pro press fittings. o Furnish and install matched inline pumps from secondary loop to primary loop, and include the following at each pump. Supply and return ball valves for isolation of pumps, circuit setters, check valves, and strainers. o Furnish and install new low water cutoff o Furnish and install condensate neutralization kit o Furnish tie in to existing controls system and ensure proper operation of existing Carrier controls system o Furnish new air separator in system (existing Bell and Gossett part number BY536006F12001) o Water balance inline pumps for proper gpms and provide report to owner o Furnish complete Factory start up o Provide owner training for proper boiler operation. o Provide 1-year parts and labor warranty guarantee o Provide bid bond of 10% of total cost of project o Provide performance bond for this project. o Provide maintenance bond for 1 year from time of acceptance of project. o Provide all clearances for all employees working on project. o Project needs to be completed within 10 days of receiving of a purchase order from CCS. o Project is to be completed based on prevailing wage / Davis Bacon Act. Certified Payroll will be required to the school district Contract Terms Collegium Charter School reserves the right to reject any and all bids and to accept the bid which is in the best interest of Collegium Charter School. Please reach out to operations@ccs.us, subject line should be boiler visit.

Bid Results

Educational

$95,740.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
813
Active Projects
419
Bidding Soon
4,820
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.