Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work and paving for a road / highway in Exton, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project involves but is not limited to: road milling and delivery / placement of Superpave Warm Mix Asphalt Wearing Course, 9.5 mm mix, 1-1/2-inch compacted depth for various roads in the township, including base repair. Questions Due Date: Mar 3rd 2025, 2:00 PM EST online question deadline 1 LS Maintenance and Protection of Traffic 2. 4,000 LF 4" Double Yellow Waterborne Pavement Markings 3. 8,000 LF 4" Single White Waterborne Pavement Markings Provide all necessary traffic controls for complete project. Contractor shall place a sign at each end of the project site detailing the start & end dates a minimum of 5 days prior to the start of work. Saw cut / mill pavement joints (all locations including driveways if applicable). Full width milling 1-1/2 inches minimum depth. Mill additional depth, if necessary. (See following pages) Contractor shall adjust all water valves if necessary with adjustment rings provided by the Township. Complete Base Repair as directed by the Township representative.(See procedure on the following pages). Sweep and Tack Coat roadway surface prior to paving. Deliver and place Leveling Course as directed by the Township representative. Deliver and place 1-1/2 inches of Wearing Course. Sealing of all joints, edges and utilities is incidental to paving. Paint 4" double yellow, and 4" single white waterborne pavement markings on Taylor Road. Alternate Bid #2: Removal of temporary stone base to a depth of 4". 2.5" Binder Course 1.5" Wearing Course Base Bid Roadways: Taylor Road - From Peck Road to Spring Run Lane - full road width. Approximate length = 4,405'. Approximate road width = 25'. Approximate total area = 12,191 square yards. Base Repair estimate = 1,000 square yards. Full Width Milling estimate = 12,191 square yards. Alternate Bid #1 Roadways: Dublin Drive - From Taylor Road to Cul-De-Sac - full road width. Approximate length = 1,550' Approximate road width = 30'. Approximate total area = 5,921 square yards. Full Width Milling estimate = 5,921 square yards. Plank Lane - From Taylor Road to Dublin Drive - full road width. Approximate length = 338'. Approximate road width = 30'. Approximate total area = 1,172 square yards. Full Width Milling estimate = 1,172 square yards. Combined Base Repair estimate = 500 square yards.

Bid Results

Roads / Highways

$138,156.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
779
Active Projects
317
Bidding Soon
4,740
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

June 16, 2025

Project location map

Multiple Locations, Exton, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.