Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 30, 2025 at 7:00 PM
Updated January 31, 2025
Site work for a water / sewer project in Fort Wayne, Indiana. Completed plans call for site work for a water / sewer project.
This Project is Stormwater Revenue the Contractor Shall Furnish All Labor, Insurance, Equipment, Materials and Power for the Complete Performance of the Following Project, Wallen Road and Village Drive Stormwater Improvements as Follows: installation of Approx. 1750 Lf of 12-inch and 15-inch Storm Piping and 24 Drainage Structures, Curb Turn Outs,water Main Lowering, Grading of Drainage Swales, and Restoration. All in Accordance With the Bidding Documents as Prepared by the City Utilities Engineering Department, City Of fort Wayne, Indiana. No Bid Will Be Accepted From, or Contract Awarded to Any Person, Firm, or Corporation That is in Arrears to The city of Fort Wayne, Indiana, Upon Any Debt or Contract, or, Who Has Failed to Execute, in Whole or in Part in A satisfactory Manner, Any Contract With the City; or, Who is a Defaulter as to Surety or Otherwise, Upon Any obligation to the City, or is Engaged in Litigation With the City. No Bid May Be Withdrawn for at Least 60 Days After the Scheduled Time for Receipt of Bids So as to Allow Review of Bids Before Announcing Award of Contract. The Successful Bidder Will Be Required to Furnish a Satisfactory labor and Material Payment Bond and Performance Bond Each in the Amount No Less Than One Hundred (100%)percent of the Contract Price. The Board Reserves the Right to Reject Any and All Bids for Failure to Comply With Applicable Laws and/or With The instructions to Bidders. The Board Also Reserves the Right to Waive Any Defect in Any Bid. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Design Manager in writing. Interpretations or clarifications considered necessary by Design Manager in response to such questions will be issued by the issuing office (herein QuestCDN) to all parties recorded as having received the Bidding Documents. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered. The City of Fort Wayne's goal for utilization of qualified Emerging Business Enterprises (EBE) as subcontractors on City projects is 10% of the Contract Price. It has been determined that the EBE goal for THIS PROJECT is 10% of the Contract Price The City has established a 10% participation goal for emerging business participation. SRF Federally Funded Projects: The Federal government has established a participation goal of 5% for Women Business Enterprises and 7% for Minority Business Enterprises. Other Federally Funded Projects: The Federal government has established a 10% participation goal for Minority and Women Business Enterprises. The bidder is required to solicit the interests, capabilities and prices from these businesses to satisfy the City and Federal participation requirements.
Bid Results
Water / Sewer
$335,880.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2025
March 3, 2025
W Wallen Rd & Village Dr, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Jan 30 2025
Fort Wayne, IN
Bid Date: Jan 30 2025
Fort Wayne, IN
Bid Date: Feb 12 2025
Fort Wayne, IN
Bid Date: Jun 05 2025
Fort Wayne, IN
Bid Date: Jan 31 2025
Fort Wayne, IN
Bid Date: Jan 30 2025
Fort Wayne, IN
Bid Date: Feb 06 2025
Fort Wayne, IN
Bid Date: Jan 14 2025
Fort Wayne, IN
Bid Date: Feb 04 2025
Fort Wayne, IN
Bid Date: Mar 05 2021
Fort Wayne, IN
Bid Date: Apr 04 2025
Fort Wayne, IN
Bid Date: Jan 08 2025
Fort Wayne, IN
Bid Date: Jan 08 2025
Fort Wayne, IN
Bid Date: Jan 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
