BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work for a civil project in Cypress, Texas. Completed plans call for site work for a water / sewer project.

Wastewater Treatment Plant Phase 4 (0.75 MGD) Question Deadline 01/29/2025 at 10:00 AM CT The deadline to ask questions is online. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer through www.civcastusa.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda to all parties recorded as being a plan holder. Questions received less than 72 hours prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Contractor is required to submit TEC Form 1295 (Certificate of Interested Parties) with their bid. The Front Office and Receptionist Desk are located on the 5th floor (Suite 500). Scope of Project: Wastewater Treatment Plant Phase 4 consists of the expansion of the existing 0.60 MGD permanent reinforced concrete wastewater treatment plant to a 0.75 MGD plant including but not limited to providing labor, materials, equipment, and required incidentals to furnish, excavate, install, and backfill one (1) reinforced concrete entrance channel, two (2) aeration basins, one (1) exit channel, fine bubble diffusers, medium bubble diffusers, one (1) aeration basin blower, replacement of three (3) lift station impellers, one (1) clarifier basin, with all attendant aboveground/underground piping, valves, fittings, appurtenances, electrical and instrumentation, sanitary sewer lines, and site restoration; in accordance with plans and specifications. Complete in Place. for the furnishing of all material, equipment, labor and supervision necessary or incidental to "Construction of Wastewater Treatment Plant Phase 4 (0.75 MGD) for Harris County MUD No. 433, Harris County, Texas. A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids. Bid date notes A Bidder submitting Electronic Bids must submit its Bid and bid securities in compliance with Owner's Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and bid securities must be submitted through online. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature in accordance with Owner's Electronic Signature Rules for Construction Contracts. 12940-00

Bid Results

Water / Sewer

$2,636,800.00

Public - County

Site Work

43

22

2

6

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
203
Bidding Soon
3,533
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 3, 2025

Project location map

19703 Tuckerton Rd, Cypress, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.