Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 14, 2025 at 8:00 PM
Updated March 15, 2025
Site work and paving for a mixed-use development in Dunn Center, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The proposed 2025 Municipal Improvements Project is a major comprehensive infrastructure upgrade within the City of Dunn Center. The overall intent of the project is to convert twenty-seven (27) city blocks to modern vehicle and pedestrian corridors from the ad hoc roadway and drainage that currently exists. Potable water, sanitary sewer, and storm sewer improvements are also included in the overall upgrade. Potable water improvements include the removal of existing PVC water main, and the installation of new PVC water main, fire hydrant assemblies, and new water service connections tying into the new water main and existing water service reconnections. Sanitary sewer improvements include the removal of existing clay pipe, and installation of new PVC sewer main and manholes. Storm sewer improvements include the removal of existing CMP culverts, the installation of PVC storm sewer pipe, manholes, and inlet structures. Street improvements include asphalt paving, curb and gutter, sidewalk, and street lighting improvements. Ancillary work includes removing existing pavement, preparing new street base and sub-base, tying to existing mains, erosion control and site stabilization - along with other incidental and miscellaneous improvements and provisions as defined in the contract documents. Est. Value: $ 7,000,000.00 Est. Completion Date: Nov. 30, 2026 Phases 1B and 2 are to be entirely completed by 11/30/2025. Phase 3 is to be entirely completed by 11/30/2026. To access the electronic bid form, download the bidding documents and click the 'Online Bid' button or Online Bidding 'Available' button on the bid posting page. After the bid close, bidders will be charged a fee of $42 for successful bid submission.
Bid Results
Roads / Highways
$7,541,240.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
May 12, 2025
Multiple Locations, Dunn Center, ND
Related To This Project
Dunn Center, ND
Bid Date: Feb 03 2023
Grand Forks AFB, ND
--
West Fargo, ND
Bid Date: Feb 04 2025
Devils Lake, ND
Bid Date: Jan 30 2025
East Morton, ND
Bid Date: Jan 30 2025
West Fargo, ND
Bid Date: Jan 23 2025
New Town, ND
Bid Date: Jan 31 2025
Grand Forks, ND
--
Grand Forks, ND
--
Abercrombie Township, ND
--
Grand Forks, ND
Bid Date: Jan 30 2025
Dickinson, ND
Bid Date: Jan 30 2025
New Town, ND
Bid Date: May 20 2025
West Fargo, ND
Bid Date: Jan 23 2025
Bismarck, ND
Bid Date: Jan 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
