BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Site work and paving for a mixed-use development in Hartford, Connecticut. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

The work of this contract includes, but is not limited to the following 1. Protection of the Still River from all construction activities accordingly 2. Removal or repair of compromised steel members 3. Removal of existing wood decking and replacement with composite decking 4. Remove west gate. Provide new steel gates at the west and east entrances of the bridge For Project Number BI-CTC-686, ASB/ Still River Pedestrian Bridge Refurbishment, CT State Community College Northwestern, Winsted, CT, As security, each bid must be accompanied by a Certified Check payable to the Treasurer of the State of Connecticut, OR the bid must be accompanied by a Bid Bond, AIA Form A-310, having as surety thereto such Surety Company or Companies as are authorized to do business in this State for an amount not less than 10% of the Bid. The awarding authority reserves the right to waive technical defects or to reject any and all bids. PERFORMANCE AND PAYMENT BONDS shall be furnished by the successful bidder awarded the contract in an amount of 100% of the Contract Sum. LAST DAY FOR RFIs will be Tuesday, January 28, 2025. PREVAILING WAGE RATES: Prevailing wage rates apply to this project. See Article 01014 of The Supplementary General Conditions. COMMISSION ON HUMAN RIGHTS AND OPPORTUNITIES: The contract to be awarded is subject to contract compliance requirements mandated by Sections 4a-60 and 4a-60a of the Connecticut General Statutes; and, when the awarding agency is the State, Sections 46a-71(d) and 46a-81i(d) of the Connecticut General Statutes. There are Contract Compliance Regulations codified at Section 46a-68j21 through 43 of the Regulations of Connecticut State Agencies, which establish a procedure for awarding all contracts covered by Sections 4a-60, 4a-60g, and 46a-71(d) of the Connecticut General Statutes. The Contractor who is selected to perform this state funded project must file and receive an approved plan by the Commission on Human Rights and Opportunities prior to the commencement of construction. This project is therefore subject to the state set-aside goals of 25% SBE and 6.25% MBE on the entire state contract amount. The contractor selected to perform this state funded project is therefore encouraged to solicit bids from subcontractors and/or vendors who are currently certified as a minority own business, a disabled owned business, and a woman owned business and/or a small business under the Department of Administration Services' Supplier Diversity Program. CONTRACTOR'S INSURANCE: Requirements for insurance coverage for the successful bidder are as outlined in THE GENERAL CONDITIONS OF THE CONTRACT. Certificates of coverage for the required insurance shall be submitted to the CSCU prior to commencing the Work. EXECUTIVE ORDERS NOS. 3, 7C, 14, 16, AND 17: Bidders are advised that the contracts for this project shall be subject to: Executive Order No. 3: This contract may be subject to Executive Order No. 3 of Governor Thomas J. Meskill, promulgated June 16, 1971, concerning labor employment practices; Executive Order No. 17 openings; Executive Order No. 16 of Governor John G. Rowland, promulgated August 4, 1999, concerning violence in the workplace. This Contract may also be subject to Executive Order 7C of Governor M. Jodi Rell, promulgated July 13, 2006, concerning contracting reforms and Executive Order 14 of Governor M. Jodi Rell, promulgated April 17. 2006, concerning procurement of cleaning products and services, in accordance with their respective terms and conditions. All of these Executive Orders are incorporated into and made a part of the Contract as if they had been fully set forth in it. At the Contractor's request, the CSCU shall provide a copy of these Orders to the Contractor. Contract Documents consist of the PROJECT MANUAL containing the INSTRUCTIONS TO BIDDERS, BID FORM, THE GENERAL CONDITIONS OF THE CONTRACT, SUPPLEMENTARY GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS SECTIONS as are found bound together and the DRAWINGS, both titled "ASB/ Still River Pedestrian Bridge Refurbishment, CT State Community College/ Northwestern" and DATED September 5, 2024 Questions may be addressed to: Engineer: MHAI Michael Horton Associates, Inc 780 East Main Street Branford, CT 06405 alombardi@mha-eng.com CSCU PM: Steven Longo, Director Facilities, Planning & Engineering Connecticut State Colleges & Universities (CSCU) 61 Woodland Street, Hartford, CT steven.longo@ct.edu College Rep: Brian Plessinger, Associate Dean of Campus Operations CT State Community College Northwestern Park Place East, Winsted, CT 06098 brian.plessinger@ctstate.edu SCOPE OF SERVICES The work of this contract includes, but is not limited to the following: 1. Protection of the Still River from all construction activities accordingly 2. Removal or repair of compromised steel members 3. Removal of existing wood decking and replacement with composite decking 4. Remove west gate. Provide new steel gates at the west and east entrances of the bridge Note: The Authorities Having Jurisdiction (AHJ) for Threshold Projects, Non-Threshold Projects, and/or Connecticut State Colleges & Universities (CSCU) construction projects, as defined by the Connecticut General Statutes, are the Connecticut Department of Administrative Services (DAS) / Construction Services (CS), Office of State Building Inspector (OSBI) and Office of State Fire Marshal (OSFM).

Bid Results

Bridges / Tunnels

$276,950.00

Public - State/Provincial

Paving, Site Work

8

14

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
930
Active Projects
453
Bidding Soon
7,002
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 7, 2025

Project location map

Multiple Locations, Hartford, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.