BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated July 11, 2025

Renovation of a water / sewer project in Eugene, Oregon. Completed plans call for the renovation of a water / sewer project.

Copies of the upcoming project documents may be obtained after March 1, 2025. Scope of Work: 1. Upgrade the Aeration Basins and associated channels, Blowers and Secondary Control Complex (SCC) Building. The scope of work to include: A. Various structural modifications. B. Retrofit of Aeration Basins 3, 4, 7 and 8 to be seismically resilient (Bid Alternate) C. Retrofit of the Secondary Control Complex (SCC) building to be seismically resilient (Bid Alternate 2) D. Building modifications including conversion of a mechanical equipment room to an electrical room. E. Roof replacement for the SCC (Bid Alternate 3) F. Addition of two new turbo blowers (and modifications to one existing turbo blower). G. Inspection, renovation and replacement of corroded process air piping and process water (W2) piping and associated valves. H. Replacement of the course bubble channel mixing system with a compressed air mixing system. I. Replacement of fine bubble diffuser discs or fine bubble diffuser system in Aeration Basins 3, 4, 7 and 8 (Bid Alternates 4 and 5). J. Replacement of the instrument air system. K. Replacement of building mechanical and plumbing systems. L. Provision of air conditioning in spaces or enclosures containing electrical equipment sensitive to temperature. M. Electrical work associated with equipment replacement and upgrades. N. Instrumentation and control work associated with equipment replacement and upgrades. O. Upgrades to electrical distribution equipment associated with the aeration system. P. Upgrades to the aeration system instrument communications system to PROFINET and associated actuators and instruments with PROFINET compatible equipment. Q. Installation of a fire alarm system. Inquiries regarding the upcoming project may be directed to the Owner's Project Manager Barry Mays (541) 682-8682, bmays@springfield-or.gov., or Assistant Project Manager Nick Thrasher (541) 744-3377, nthrasher@springfield-or.gov. A mandatory pre-bid conference for General Contractors (subcontractors encourage to attend) will be held at the Wastewater Pollution Control Facility (WPCF), 410 River Ave., Eugene, OR. Date and time to be announced in the Invitation to Bid. The current cost estimate for construction is between $26 mil to $29 mil dependent on alternates. Questions about the contents of the Contract Documents must be directed to the Owner (Barry Mays, Project Manager @ bmays@springfield-or.gov or 541- 682-8682), and not to the Design Consultant. Where deemed necessary by the Owner, all responses to the questions will be in written form in an addendum to the Contract Documents and issued to all listed document holders.

Bid Results

Water / Sewer

$27,743,230.00

Public - City

Renovation

19

28

60

4

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
25
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

July 1, 2025

Project location map

410 River Ave, Eugene, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.