Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 7, 2025 at 7:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Chula Vista, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The purpose of this bid is to provide and install asphalt and concrete coverings at various sites throughout the District as specified in the Scope of Work and Bid Form. The covered work consists of furnishing all labor, material, equipment, transportation, and supervision for performing all necessary operations required for proper execution of scope of work as listed in the bid documents. Scope of Work: **Please refer to Attachment A, Project Binder, for site maps and additional site-specific notes. ** Lot:1 Hilltop Middle School: 44 E. J Street, Chula Vista, CA. 91910 Project Schedule: TBDAll prep work must be inspected and signed-off by Frank Mendoza prior to Asphalt installation. o Apply Ranger Pro Herbicide to all vegetation and cracks three weeks prior to starting the project. Post notifications two-weeks prior to spraying in compliance with law. Please include physical site notifications, California State Department of Pesticide Regulation, and District Environmental Health & Safety Department. o Prep area using a line trimmer or similar equipment, sweep and blow all work areas. Remove and properly dispose of all vegetation and waste material off property. o Next to Room 506: Demo and remove four (4) planters, stumps, and exposed roots 12" below grade. Remove and haul away 3" of soil and any existing concrete/pavers. Install 3" asphalt before overlay. Remove existing black handrails approximately 55'. o In front of ASB: Demo and remove four (4) planters, stumps, and exposed roots 12" below grade and three (3) 10' x 18' concrete slabs. Remove and haul away soil and base pave before overlay. o Trench 12" wide x 30" deep x 120' long and install 4" sand. District will install new gas line. Install another 4" sand, backfill and compact soil, and haul away all left-over soil and debris. Base pave 4" before overlay o Remove cage and Rubbermaid mat and base pave. o Remove all roots that are a trip hazard and base pave. o Repair two broken Drainpipes before overlay. o Girls PE: Demo, remove and replace concrete walkway approximately 8'x130' long x 6" thick. Use 3/8" rebar 18" O.C. with 3,500 PSI with fiber concrete. o Boys PE: Demo, remove and replace concrete walkway approximately 8'x112' long x 6" thick. Use 3/8" rebar 18" O.C. with 3,500 PSI with fiber concrete. o Grind 2" inches deep x 48" inches wide around the red line perimeter for a smooth tra Lot: 2 Southwest Middle School: 2710 Iris Avenue, San Diego, CA. 92154 Project Schedule: TBD o Move existing storage container/Conex box next to the one located on the northside and install a 5'x10' concrete pad 4" thick in front of the door. o All prep work must be inspected and signed-off by Frank Mendoza prior to Asphalt installation. o Apply Ranger Pro Herbicide to all vegetation and cracks three weeks prior to starting the project. Post notifications two-weeks prior to spraying in compliance with law. Please include physical site notifications, California State Department of Pesticide Regulation, and District Environmental Health & Safety Department. Lot: 3 National City Middle School: 1701 D Avenue, National City, CA. 91950 Project Schedule: TBD o All prep work must be inspected and signed-off by Frank Mendoza prior to Asphalt installation. o Apply Ranger Pro Herbicide to all vegetation and cracks three weeks prior to starting the project. Post notifications two-weeks prior to spraying in compliance with law. Please include physical site notifications, California State Department of Pesticide Regulation, and District Environmental Health & Safety Department. o Prep area using a line trimmer or similar equipment, sweep and blow all work areas. Remove and properly dispose of all vegetation and waste material off property. o Grind 2" inches deep x 48" inches wide around the red line perimeter for a smooth transition to existing elevation. o Grind and fill cracks 1/4 " inch and larger. Grind cracks 2 inches deep by 12 inches wide and fill/compact with 1/2 " aggregate fine mix. o Replace all access boxes and set them to new elevation. o Level depressions 1/8" inch and deeper to prevent ponding. Base pave any low spots as needed. o Excavate a 12"x12" footings, properly dispose soil, form a 12"x24" concrete stem wall/curb approximately 90' long with chamfered edges above footings, install 1/2 " rebar "L" shape 18" O.C. with three (3) cross bars, pour 3500 PSI big rock concrete with fiber. Once concrete is cured, install skateboard aluminum prevention devices with 45-degree brackets and chamfered edge every 2', must use tamper-proof stainless-steel screws and drop-in anchors with epoxy glue.Lot: 4 Hilltop High School: 555 Claire Avenue, Chula Vista, CA. 91910 Project Schedule: TBD o All prep work must be inspected and signed-off by Frank Mendoza prior to Asphalt installation. o Apply Ranger Pro Herbicide to all vegetation and cracks three weeks prior to starting the project. Post notifications two-weeks prior to spraying in compliance with law. Please include physical site notifications, California State Department of Pesticide Regulation, and District Environmental Health & Safety Department. o Prep area using a line trimmer or similar equipment, sweep and blow all work areas. Remove and properly dispose of all vegetation and waste material off property. o Grind 2" inches deep x 48" inches wide around the red line perimeter for a smooth transition to existing elevation. o Grind and fill cracks 1/4 " inch and larger. Grind cracks 2 inches deep by 12 inches wide and fill/compact with 1/2 " aggregate fine mix. o Replace/fabricate all access boxes and set them to new elevation. o Level depressions 1/8" inch and deeper to prevent ponding. Base pave any low spots as needed. o Remove existing post and install two new sets of volleyball/pickle ball courts, four galvanized sleeves with caps, two feet deep footings x 12" wide, install 2" above existing elevation prior to overlay, four 2-7/8" galvanized post, with four (4) bolt on stainless steel Handle winch, and heavy-duty volleyball nets (model: HD2) or equal to. o Remove and replace eight (8) basketball nets with BSN Sports Brute Basketball nets or equal to. o Tack coat entire surface prior to overlay uniformly and evenly. Apply geotextile fabric over entire surface. o Overlay entire marked area with 2" thick, with 3/8" school mix asphalt overlay. o Seal coat with Guard Top or equal, all areas 21 days after asphalt installation with two separate coats. Allow one full dry day in between coats. Diluting the product over 15% will not be allowed. Contractor is responsible to provide documentation on how much water was added to the product. Stripe/paint all lines and curbs as needed, per existing layout Question Deadline 01/28/2025 at 1:00 PM PT
Bid Results
Roads / Highways
$1,150,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2025
March 10, 2025

Multiple Locations, Chula Vista, CA
Related To This Project
Chula Vista, CA
Bid Date: Feb 06 2025
Chula Vista, CA
--
Chula Vista, CA
--
Chula Vista, CA
Bid Date: Jan 29 2025
Chula Vista, CA
Bid Date: Mar 12 2025
Chula Vista, CA
Bid Date: Feb 27 2025
Chula Vista, CA
Bid Date: Feb 14 2025
Chula Vista, CA
Bid Date: Feb 12 2025
Chula Vista, CA
Bid Date: Feb 04 2025
Chula Vista, CA
Bid Date: Jan 27 2025
Chula Vista, CA
Bid Date: Jan 30 2025
Chula Vista, CA
--
Chula Vista, CA
Bid Date: Jan 23 2025
Chula Vista, CA
Bid Date: Jan 09 2025
Chula Vista, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.