Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 26, 2026 at 8:00 PM
Updated March 27, 2026
Site work and paving for a road / highway in Raleigh, North Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
https://www.bizjournals.com/triangle/news/2026/01/04/rdu-raleigh-durham-highway-road-work-construction.html Summary (based only on the provided article content): The Triangle Business Journal reports that five major road projects in North Carolina are set to impact drivers in 2026. The article highlights that the Triangle region's rapid growth is driving the state to tackle some of its largest transportation projects in years. The article is written by Lauren Ohnesorge, Senior Reporter, and was published on Jan. 4, 2026. An accompanying image caption notes that major construction projects will affect drivers around the region, with image credit to mehmet demirci. Construction-related details: Project type: Road and transportation infrastructure projects Scope: Major construction impacting regional drivers Location: Triangle region, North Carolina Project values, start dates, owners, contractors, or detailed scope: Not provided New construction vs. renovation: Not specified, though described as "major construction" to address growth The article focuses on transportation infrastructure prompted by regional population growth. ___________________________________________________________________________________________________________________________________________________________ https://www.wral.com/news/local/study-recommends-capital-boulevard-toll-road-raleigh-wake-forest/ Study evaluates tolls for Capital Boulevard between I-540 and Wake Forest A new study evaluates tolls as part of the Capital Boulevard Improvement Project between Interstate 540 in north Raleigh and the Franklin County line, near Wake Forest. A new study evaluates tolls as part of the Capital Boulevard Improvement Project between Interstate 540 in north Raleigh and the Franklin County line, near Wake Forest. A spokesperson from the Capital Area Metropolitan Planning Organization (CAMPO) told WRAL News the organization requested the study from the North Carolina Turnpike Authority. The results released Wednesday evaluate several toll options for improvements to a portion of Capital Boulevard/U.S. Highway 1 and beginning upgrades in 2027. The construction would take about six years. A CAMPO spokesperson said the change would ultimately ease traffic congestion by removing stoplights and creating highway interchanges. The organization will ask for public input for 30 days before making a decision in May. A project page on the State Department of Transportation website states between 32,000 and 65,000 vehicles travel the stretch of Capital Boulevard each day, and traffic is anticipated to increase to 44,000 to 75,000 vehicles each day by 2040. "Travel times are highly variable, making it difficult for drivers to plan trips. A trip at evening peak hour, for example, can take up to four times longer than trips at non-peak times," the NCDOT writes. ---------------------------------------------------------------------------------------------- US 70 to SR 1829 (Leesville Road) in Raleigh. Construct Eastbound Auxiliary Lane. County : wake Route : I-540 Length (Miles) :2.53 Sti Category Funded : Statewide Mobility As of March 26, 2026 , the project is in Conceptual status Anticipated letting date is 2032 NC DOT - Construct Eastbound Auxiliary Lane - I-540 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$35,700,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2031
I-540, Raleigh, NC
Related To This Project
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
Bid Date: Feb 10 2025
Raleigh, NC
Bid Date: Jan 10 2025
Raleigh, NC
Bid Date: Jan 23 2025
Raleigh, NC
--
Raleigh, NC
Bid Date: Jan 29 2025
Raleigh, NC
Bid Date: Jan 17 2025
Raleigh, NC
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed