Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Site work for a civil project in White Haven, Pennsylvania. Completed plans call for site work for a water / sewer project; and water / sewer project.

*29 January 2025: RFIs Answered: Question 2: The following clauses do not appear to apply to this solicitation. Can you confirm If they do, can you please explain how they would apply DFARS 252.204-7016 through 7018 regarding telecommunications DFARS 252.225-7048 Export Controls Answer 2: USACE is required to follow the Defense Federal Acquisition Regulation Supplement (DFARS). DFARS 204.2105 states that provisions 252.204-7016 and 252.204-7017 and clause 252.204-7018 be included in all solicitations. DFARS 225.7901-4 states that clause 252.225-7048 be included is all solicitations. Question 3: Where will contractors be permitted to stockpile materials for the project Answer 3: USACE will provide a location on site within close proximity of the work zone. The location(s) will be determined when the job begins based on discussion with the Contractor. Numerous locations are suitable and will be made available. *22 January 2025: RFI Answered: Question 1: How many people does the Prime Contractor have to have on site Does the QCM/SSHO have to be separate from the Superintendent Will two people be required on site during construction or will one person suffice Answer 1: The Superintendent and QCM/SSHO can dual-hat and be the same individual; however, the Performance Work Statement as written requires, at a minimum, the above-mentioned position, laborers, traffic control, etc. The work could not be completed, nor the safety requirements be met with just one individual on site. *16 January 2025: Added price schedule to attachments* The Philadelphia Office of the U.S. Corps of Engineers is solicitating the services of a contractor to provide an application of a double bituminous seal coat for four specified areas of roadway at the Francis E. Walter Dam project located in Carbon and Luzerne Counties in White Haven, PA. See attachments for full specifications and instruction. Quotes shall be due to the Contract Specialist Katie Sayers at Katie.L.Sayers@usace.army.mil no later than 10 February 2025 at 1:00 P.M. EST. No hard copies will be accepted. Requests for information (RFIs) can be submitted to the contract specialist at the email address above. Please submit RFIs by 5:00 PM EST on 27 January 2025. Period of Performance: The period of performance for CLINS 001, 002, and 004 is 60 days after Notice to Proceed (NTP). The period of performance for CLIN 003 is 270 days after NTP.

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
152
Bidding Soon
2,786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

March 12, 2025

Project location map

146 Walter Dm Rd, White Haven, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.